Testing Process in a software Development life cycle environment

We have the below Testing process in the SDLC enviroment in each organisation which is in Software Development business.


Test Plan : Writing Test Plan for the project and define Scope of test, 
    Modules to be tested, Not in scope items,Phases of the project, 
    Milestones of the project. Resources to work on the project. Effort Esitmation, testing                types to be perfomed during projects,Entry and Exit criteria. Risk and mitigation plan

Test case Design : Designing the test cases based on the FRD

Test case Review : Review Test Cases and provide feedback to update/add/delete if required

Business Review  : Send the test cases to Business for review and sign off

QA Environment   : Prepare the QA Enviroment separately from the Dev env , Builds to be deployed to QA environment

Test data  : Prepare/get the test data to be used for testing, Send emails to Developers/business for the test data requirement

Sanity testing   : Sanity/Smoke Testing of the application once the Build is deployed and identify Bugs before testing starts.
   Logging the Critical/Show stopper Defects of the application before functional testing starts

Traceability Matrix: Prepare a Traceability Matrix in Excel sheet and tag with requirements
Update this while test execution phase.

Test Execution    : Execution of the already designed test cases 

Defects     : Logging Defects in JIRA and assign them to Developers with screenshots

Fixing the Defects  : Push Developers to fix the defects and QA to retest them

Re-Testing : Retesting the defects and close them if fixed

Daily QA Status Report  : Publish a daily status report to all the project stake holders

Security Testing scope and execution : Identify the scope of security Testing in each project , identify the test areas, Perfom the security test in parellel to functional testing

Security testing sign off : QA team lead to ensure the sign off has been provided before the UAT

SIT Testing Sign Off   : Sign off testing by closing all the Critical/High/low defects

UAT Test Design   : UAT test cases to be designed by Business  

UAT Test Execution   : UAT  to be perfomed by the Business and report defects if any

UAT Sign Off   : UAT Sign off to be provided by Business Users/Business Team Lead for each project

Deployment-Prod   : Deployment to production Live
 

Sunday, December 28, 2014

Cloud testing



 
Overview
Cloud Testing uses cloud infrastructure for software testing. Organizations pursuing testing in general and load, performance testing and production service monitoring in particular are challenged by several problems like limited test budget, meeting deadlines, high costs per test, large number of test cases, and little or no reuse of tests and geographical distribution of users add to the challenges. Moreover ensuring high quality service delivery and avoiding outages requires testing in one's datacenter, outside the data-center, or both. Cloud Testing is the solution to all these problems. Effective unlimited storage, quick availability of the infrastructure with scalability, flexibility and availability of distributed testing environment reduce the execution time of testing of large applications and lead to cost-effective solutions.

Need for cloud testing

Traditional approaches to test a software incurs high cost to simulate user activity from different geographic locations. Testing firewalls and load balancers involves expenditure on hardware, software and its maintenance. In case of applications where rate of increase in number of users is unpredictable or there is variation in deployment environment depending on client requirements, cloud testing is more effective.

Types of testings supported






Types of testing

Stress

Stress Test is used to determine ability of application to maintain a certain level of effectiveness beyond breaking point. It is essential for any application to work even under excessive stress and maintain stability. Stress testing assures this by creating peak loads using simulators. But the cost of creating such scenarios is enormous. Instead of investing capital in building on-premise testing environments, cloud testing offers an affordable and scalable alternative.

Load

Load testing of an application involves creation of heavy user traffic, and measuring its response. There is also a need to tune the performance of any application to meet certain standards. However a number of tools are available for that purpose.

Performance

Finding out thresholds, bottlenecks & limitations is a part of performance testing. For this, testing performance under a particular workload is necessary. By using cloud testing, it is easy to create such environment and vary the nature of traffic on-demand. This effectively reduces cost and time by simulating thousands of geographically targeted users.

Functional

Functional testing of both internet and non-internet applications can be performed using cloud testing. The process of verification against specifications or system requirements is carried out in the cloud instead of on-site software testing.

Compatibility

Using cloud environment, instances of different Operating Systems can be created on demand, making compatibility testing effortless.

Browser performance

To verify application's support for various browser types and performance in each type can be accomplished with ease. Various tools enable automated website testing from the cloud.

Latency

Cloud testing is utilized to measure the latency between the action and the corresponding response for any application after deploying it on cloud.

Steps

Companies simulate real world Web users by using cloud testing services that are provided by cloud service vendors such as Advaltis, Compuware, HP, Keynote Systems, Load Impact, Neotys and SOASTA. Once user scenarios are developed and the test is designed, these service providers leverage cloud servers (provided by cloud platform vendors such as Amazon.com,Flipkart.com,Google, Rackspace, Microsoft, etc.) to generate web traffic that originates from around the world. Once the test is complete, the cloud service providers deliver results and analytics back to corporate IT professionals through real-time dashboards for a complete analysis of how their applications and the internet will perform during peak volumes.

Steps for Cloud Testing



Keys to successful testing

  1. Understanding a platform provider's elasticity model/dynamic configuration method
  2. Staying abreast of the provider's evolving monitoring services and Service Level Agreements (SLAs)
  3. Potentially engaging the service provider as an on-going operations partner if producing commercial off-the-shelf (COTS) software
  4. Being willing to be used as a case study by the cloud service provider. The latter may lead to cost reductions.

Applications

Cloud testing is often seen as only performance or load tests, however, as discussed earlier it covers many other types of testing. Cloud computing itself is often referred to as the marriage of software as a service (SaaS) and utility computing. In regard to test execution, the software offered as a service may be a transaction generator and the cloud provider's infrastructure software, or may just be the latter. Distributed Systems and Parallel Systems mainly use this approach for testing, because of their inherent complex nature. D-Cloud is an example of such a software testing environment.
For testing non-internet applications, virtual instances of testing environment can be quickly set up to do automated testing of the application. The cloud testing service providers provide essential testing environment as per the requirement of the application under test. The actual testing of applications is performed by the testing team of the organization which owns the application or third party testing vendors.

Tools

Leading cloud computing service providers include, among others, Amazon, Advaltis, 3-terra, Skytap, HP and SOASTA. Some of the tools for cloud testing include :
  1. Soatest
  2. HP LoadRunner

Benefits

The ability and cost to simulate web traffic for software testing purposes has been an inhibitor to overall web reliability. The low cost and accessibility of the cloud's extremely large computing resources provides the ability to replicate real world usage of these systems by geographically distributed users, executing wide varieties of user scenarios, at scales previously unattainable in traditional testing environments. Minimal start-up time along with quality assurance can be achieved by cloud testing.
Following are some of the key benefits:

Issues

The initial setup cost for migrating testing to cloud is very high as it involves modifying some of the test cases to suit cloud environment. This makes the decision of migration crucial. Therefore, cloud testing is not necessarily the best solution to all testing problems.
Legacy systems & services need to be modified in order to be tested on cloud. Usage of robust interfaces with these legacy systems may solve this problem. Also like any other cloud services, cloud testing is vulnerable to security issues.
The test results may not be accurate due to varying performance of service providers’ network and internet. In many cases, service virtualization can be applied to simulate the specific performance and behaviors required for accurate and thorough testing.

Friday, May 3, 2013

ISTQB Certification- Fundamental-Question bank


1: Given the following state transition table Which of the test cases below will cover

the following series of state transitions? S1 SO S1 S2 SO

Exhibit:

A. D, A, B, C.

B. A, B, C, D.

C. D, A, B.

D. A, B, C.



2: From a Testing perspective, what are the MAIN purposes of Configuration

Management?:

i) Identifying the version of software under test.

ii) Controlling the version of testware items.

iii) Developing new testware items.

iv) Tracking changes to testware items.

v) Analysing the need for new testware items.

A. ii, iv and v.

B. ii, iii and iv.i,

C. i, ii and iv.

D. i, iii and v.



3: Which of the following is a MAJOR task of test planning?

A. Scheduling test analysis and design tasks.

B. Initiating corrective actions.

C. Monitoring progress and test coverage.

D. Measuring and analyzing results.



4: Which of the following BEST describes the difference between an inspection and a

walkthrough?

A. Both inspections and walkthroughs are led by the author.

B. An inspection is led by a moderator and a walkthrough is led by the author.

C. Both inspections and walkthroughs are led by a trained moderator.

D. A walkthrough is led by the author. The author is not present during inspections.



5: Where may functional testing be performed?

A. At system and acceptance testing levels only.

B. At all test levels.

C. At all levels above integration testing.

D. At the acceptance testing level only.



6: What is the MAIN objective when reviewing a software deliverable?

A. To identify potential application failures by use of a test specification.

B. To identify defects in any software work product.

C. To identify spelling mistakes in a requirements specification.

D. To identify standards inconsistencies in the code.



7: Who would USUALLY perform debugging activities?

A. Developers.

B. Analysts.

C. Testers.

D. Incident Managers.



8: Which of the following would you NOT usually find on a software incident report?

A. The name and/or organisational position of the person raising the problem.

B. Version of the Software Under Test.

C. Suggestions as to how to fix the problem.

D. Actual and expected results.



9: Which of the following defines the expected results of a test?

A. Test case specification.

B. Test design specification.

C. Test procedure specification.

D. Test results.



10: Some tools are geared more for developer use. For the 5 tools listed, which

statement BEST details those for developers

i) Performance testing tools.

ii) Coverage measurement tools.

iii) Test comparators.

iv) Dynamic analysis tools.

v) Incident management tools.

A. i, iii. and iv. are more for developers.

B. ii. and iv. are more for developers.

C. ii, iii. and iv. are more for developers.

D. ii. and iii. are more for developers.



11: Which of the following is correct?

A. Impact analysis assesses the effect on the system of a defect found in regression testing.

B. Impact analysis assesses the effect of a new person joining the regression test team.

C. Impact analysis assesses whether or not a defect found in regression testing has been

fixed correctly.

D. Impact analysis assesses the effect of a change to the system to determine how much

regression testing to do.



12: As part of which test process do you determine the exit criteria?

A. Test planning.

B. Evaluating exit criteria and reporting.

C. Test closure.

D. Test control.



13: Given the following state transition diagram Which of the following series of

state transitions contains an INVALID transition which may indicate a fault in the system

design?

Exhibit:

A. Login Browse Basket Checkout Basket Checkout Pay Logout.

B. Login Browse Basket Checkout Pay Logout.

C. Login Browse Basket Checkout Basket Logout.

D. Login Browse Basket Browse Basket Checkout Pay Logout.



14: Which of the following is a MAJOR task of test implementation and execution?

A. Measuring and analyzing results.

B. Reporting discrepancies as incidents.

C. Identifying test conditions or test requirements.

D. Assessing if more tests are needed.



15: What is beta testing?

A. Testing performed by potential customers at the developers location.

B. Testing performed by potential customers at their own locations.

C. Testing performed by product developers at the customer's location.

D. Testing performed by product developers at their own locations.

16: Given the following fragment of code, how many tests are required for 100%

decision coverage?

if width > length

then

biggest_dimension = width

if height > width

then

biggest_dimension = height

end_if

else

biggest_dimension = length

if height > length

then

biggest_dimension = height

end_if

end_if

A. 3

B. 4

C. 2

D. 1



17: You have designed test cases to provide 100% statement and 100% decision

coverage for the following fragment of code.

if width > length

then

biggest_dimension = width

else

biggest_dimension = length

end_if

The following has been added to the bottom of the code fragment above.

print "Biggest dimension is " & biggest_dimension

print "Width: " & width

print "Length: " & length





How many more test cases are required?

A. One more test case will be required for 100 % decision coverage.

B. Two more test cases will be required for 100 % statement coverage, one of which will be

used to provide 100% decision coverage.

C. None, existing test cases can be used.

D. One more test case will be required for 100" statement coverage.



18: A thermometer measures temperature in whole degrees only. If the temperature

falls below 18 degrees, the heating is switched off. It is switched on again when the

temperature reaches 21 degrees. What are the best values in degrees to cover all

equivalence partitions?

A. 15, 19 and 25.

B. 17, 18 and19.

C. 18, 20 and22.

D. 16, 26 and 32.



19: Which activity in the fundamental test process creates test suites for efficient

test execution?

A. Implementation and execution.

B. Planning and control.

C. Analysis and design.

D. Test closure.



20: Which of the following is TRUE?

A. Confirmation testing is testing fixes to a set of defects and Regression testing is testing

to establish whether any defects have been introduced as a result of changes.

B. Confirmation testing is testing to establish whether any defects have been introduced as

a result of changes and Regression testing is testing fixes to a set of defects.

C. Confirmation testing and Regression testing are both testing to establish whether any

defects have been introduced as a result of changes.

D. Confirmation testing and Regression testing are both testing fixes to a set of defects.



21: Given the following decision table: Which of the following test cases and

expected results is VALID?

Rule 1 Rule 2 Rule 3 Rule 4

Conditions

Age <21>
yrs

21-29 yrs 30-50yrs > 50yrs

Insurance

Class

A A or B B. C or D C or D

Actions

Premium £100 £90 £70 £70

Excess £2,500 £2,500 £500 £1000

A. 23 year old in insurance class A Premium is 0 and excess is,500.

B. 51 year old in insurance class C Premium is 0 and excess is 00.

C. 31 year old in insurance class B Premium is 0 and excess is ,500.

D. 43 year old in insurance class C Premium is 0 and excess is ,000.



22: When should configuration management procedures be implemented?

A. During test planning.

B. During test analysis.

C. During test execution.

D. When evaluating exit criteria



23: Which of the following are characteristic of regression testing ?

i) Regression testing is run ONLY once

ii) Regression testing is used after fixes have been made

iii) Regression testing is often automated

iv) Regression tests need not be maintained

Options:

A. ii, iv.

B. ii, iii.

C. i, iii, iv.

D. iii.





24: A wholesaler sells printer cartridges. The minimum order quantity is 5. There is

a 20% discount for orders of 100 or more printer cartridges. You have been asked to

prepare test cases using various values for the number of printer cartridges ordered.

Which of the following groups contain three test inputs that would be generated using

Boundary Value Analysis?

A. 5, 6, 20

B. 4, 5, 80

C. 4, 5, 99

D. 1, 20, 100



25: Which of the following activities should be performed during the selection and

implementation of a testing tool?

i) Investigate the organisation's test process.

ii) Conduct a proof of concept.

iii) Implement the selected tool on a project behind schedule to save time.

iv) Identify coaching and mentoring requirements for the use of the selected tool.

Options:

A. i, ii, iii.

B. ii, iii, iv.

C. i, iii, iv.

D. i, ii, iv.



26: What is the MAIN benefit of designing tests early in the life cycle?

A. It is cheaper than designing tests during the test phases.

B. It helps prevent defects from being introduced into the code.

C. Tests designed early are more effective than tests designed later.

D. It saves time during the testing phases when testers are busy.



27: Which of the following benefits are MOST likely to be achieved by using test

tools?

i) Easy to access information about tests and testing.

ii) Reduced maintenance of testware.

iii) Easy and cheap to implement.

iv) Greater consistency of tests.

Options:

A. ii and iv

B. ii and iii

C. i and iv

D. i and iii



28: What is the KEY difference between preventative and reactive approaches to

testing?

A. Preventative tests and reactive tests are designed as early as possible.

B. Preventative tests are designed early; reactive tests are designed after the software has

been produced.

C. Preventative testing is always analytical; reactive testing is always heuristic.

D. Preventative tests are designed after the software has been produced; reactive tests are

designed early in response to review comments.



29: What is the purpose of exit criteria?

A. To define when a test level is complete.

B. To determine when a test has completed.

C. To identify when a software system should be retired.

D. To determine whether a test has passed.



30: What determines the level of risk?

A. The cost of dealing with an adverse event if it occurs.

B. The probability that an adverse event will occur.

C. The amount of testing planned before release of a system.

D. The likelihood of an adverse event and the impact of the event.



31: With which of the following categories is a test comparator tool USUALLY

associated?

A. Tool support for performance and monitoring.

B. Tool support for static testing.

C. Tool support for test execution and logging.

D. Tool support for the management of testing and tests.



32: Which activities form part of test planning?

i) Developing test cases.

ii) Defining the overall approach to testing.

iii) Assigning resources.

iv) Building the test environment

v) Writing test conditions.

A. i, ii & iv are true, iii & v are false.

B. ii & iii are true, i, iv & v are false.

C. iv & v are true, i, ii & iii are false.

D. i, ii & iii are true iv & v are false.



33: Match the following terms and statements.

1.Decision Table Testing

2.Decision Testing

3.State Transition Testing

4.Exploratory Testing

W. Testing carried out w boxes to achieve specific test objectives, possibly to complement

structured testing.

X. A test technique used which may be used to verify different system re depending on

current conditions or previous history.

Y. A test technique which combines combinations of inputs that might not otherwise have

been exercised during testing.

Z. A form of control flow testing based on decision outcomes.

Options:

A. 1Y, 2Z, 3X, 4W.

B. 1X ,2W, 3Z, 4Y.

C. 1Z, 2X, 3W, 4Y.

D. 1Z, 2Y, 3X, 4W.



34: Which type of test design techniques does the following statement best describe

a procedure to derive test cases based on the specification of a component?

A. Black Box Techniques.

B. White Box Techniques.

C. Glass Box Techniques.

D. Experience Based Techniques.



35: For which of the following would a static analysis tool be MOST useful?

A. Supporting reviews.

B. Validating models of the software.

C. Testing code executed in a special test harness.

D. Enforcement of coding standards.



36: Which of the following types of defects is use case testing MOST LIKELY to

uncover?

i) Defects in the process flows during real-world use of the system.

ii) Defects in the interface parameters in integration testing.

iii) Integration defects caused by the interaction and interference of different components.

iv) Defects in the system as it transitions between one state and another.

A. ii, iii.

B. i, iii.

C. iii, iv.

D. i, ii



37: Which of the following is MOST important in the selection of a test approach?

A. Availability of tools to support the proposed techniques.

B. The budget allowed for training in proposed techniques.

C. Available skills and experience in the proposed techniques.

D. The willingness of the test team to learn new techniques.



38: Which of the following is a benefit of test independence?

A. It does not require familiarity with the code.

B. It is cheaper than using developers to test their own code.

C. It avoids author bias in defining effective tests.

D. Testers are better at finding defects than developers.



39: The above diagram represents the following paths through the code.

A. vwy

B. vwz

C. vxy

D. vxz

What is the MINIMUM combination of paths required to provide full statement coverage?

Exhibit:

A. A

B. ABD

C. ABCD

D. ACD



40: Which of the following is MOST characteristic of specification based (black-box)

techniques?

A. Test cases can be easily automated.

B. Test cases are independent of each other.

C. Test cases are derived systematically from models of the system .

D. Test cases are derived systematically from the delivered code.



41: Which of the following combinations correctly describes a valid approach to

component testing:

i) Functional testing of the component in isolation.

ii) Structure-based testing of the code without recording incidents.

iii) Automated tests that are run until the component passes.

iv) Functional testing of the interfaces between modules.

A. i and ii.

B. I, ii and iii

C. iii.

D. ii and iv



42: Which of the following is a purpose of the review planning phase?

A. Log defects.

B. Explain the documents to the participants.

C. Gather metrics.

D. Allocate the individual roles.



43: A defect arrival rate curve:

A. Shows the number of newly discovered defects per unit time

B. Shows the number of open defects per unit time.

C. Shows the cumulative total number of defects found up to this time.

D. Any of these, depending on the company.



44: Which is the best definition of complete testing:

A. You have discovered every bug in the program.

B. You have tested every statement, branch, and combination of branches in the program.

C. You have completed every test in the test plan.

D. You have reached the scheduled ship date.



45: Complete statement and branch coverage means:

A. That you have tested every statement in the program.

B. That you have tested every statement and every branch in the program.

C. That you have tested every IF statement in the program.

D. That you have tested every combination of values of IF statements in the program



46: There are several risks of managing your project's schedule with a statistical

reliability model. These include (choose one or more of the following):

A. Testers spend more energy early in the product trying to find bugs than preparing to do

the rest of the project's work more efficiently

B. Managers might not realize that the testing effort is ineffective, late in the project,

because they expect a low rate of bug finding, so the low rate achieved doesn't alarm

them.

C. It can increase the end-of-project pressure on testers to not find bugs, or to not report

bugs.

D. All of the above



47: Typical defects that are easier to find in reviews than in dynamic testing are:

A. Deviations from standards,

B. Requirement defects,

C. Design defects,

D. Insufficient maintainability and incorrect interface specifications.

E. All of the above.



48: Reviews, static analysis and dynamic testing have the same objective

A. Identifying defects.

B. Fixing defects.

C. A. and B

D. None of the above



49: We can achieve complete statement coverage but still miss bugs because:

A. The failure occurs only if you reach a statement taking the TRUE branch of an IF

statement, and you got to the statement with a test that passed through the FALSE branch.

B. The failure depends on the program's inability to handle specific data values, rather than

on the program's flow of control.

C. We are not required to test code that customers are unlikely to execute.

D. All of the above



50: Measurement dysfunction is a problem because:

A. Even though the numbers you look at appear better, to achieve these numbers, people

are doing other aspects of their work much less well.

B. We don't know how to measure a variable (our measurement is dysfunctional) and so we

don't know how to interpret the result.

C. You are measuring the wrong thing and thus reaching the wrong conclusions.

D. All of the above.

51: Important consequences of the impossibility of complete testing are (Choose one

or more answers):

A. We can never be certain that the program is bug free.

B. We have no definite stopping point for testing, which makes it easier for some managers

to argue for very little testing.

C. We have no easy answer for what testing tasks should always be required, because every

task takes time that could be spent on other high importance tasks.

D. All of the above.



52: Poor software characteristics are

A. Only Project risks

B. Only Product risks

C. Project risks and Product risks

D. Project risks or Product risks



53: System testing should investigate

A. Non-functional requirements only not Functional requirements

B. Functional requirements only not non-functional requirements

C. Non-functional requirements and Functional requirements

D. Non-functional requirements or Functional requirements



54: Contract and regulation testing is a part of

A. System testing

B. Acceptance testing

C. Integration testing

D. Smoke testing



55: Find the correct flow of the phases of a formal review

A. Planning, Review meeting, Rework, Kick off

B. Planning, Individual preparation, Kick off, Rework

C. Planning, Review meeting, Rework, Follow up

D. Planning, Individual preparation, Follow up, Kick off



56: Which is not the testing objectives

A. Finding defects

B. Gaining confidence about the level of quality and providing information

C. Preventing defects.

D. Debugging defects



57: Maintenance releases and technical assistance centers are examples of which of

the following costs of quality?

A. External failure

B. Internal failure

C. Appraisal

D. Prevention



58: Which is not the project risks

A. Supplier issues

B. Organization factors

C. Technical issues

D. Error-prone software delivered



59: Bug life cycle

A. Open, Assigned, Fixed, Closed

B. Open, Fixed, Assigned, Closed

C. Assigned, Open, Closed, Fixed

D. Assigned, Open, Fixed, Closed



60: Who is responsible for document all the issues, problems and open point that

were identified during the review meeting

A. Moderator

B. Scribe

C. Reviewers

D. Author



61: ‘X’ has given a data on a person age, which should be between 1 to 99. Using

BVA which is the appropriate one

A. 0,1,2,99

B. 1, 99, 100, 98

C. 0, 1, 99, 100

D. –1, 0, 1, 99



62: Which is not a testing principle

A. Early testing

B. Defect clustering

C. Pesticide paradox

D. Exhaustive testing



63: A project that is in the implementation phase is six weeks behind schedule.

The delivery date for the product is four months away. The project is not allowed to slip

the delivery date or compromise on the quality standards established for his product. Which

of the following actions would bring this project back on schedule?

A. Eliminate some of the requirements that have not yet been implemented.

B. Add more engineers to the project to make up for lost work.

C. Ask the current developers to work overtime until the lost work is recovered.

D. Hire more software quality assurance personnel.



64: The ___________ Testing will be performed by the people at client own

locations

A. Alpha testing

B. Field testing

C. Performance testing

D. System testing



65: Which of the following is the standard for the Software product quality

A. ISO 1926

B. ISO 829

C. ISO 1012

D. ISO 1028



66: Which is not a black box testing technique

A. Equivalence partition

B. Decision tables

C. Transaction diagrams

D. Decision testing



67: Find the mismatch

A. Test data preparation tools – Manipulate Data bases

B. Test design tools – Generate test inputs

C. Requirement management tools – Enables individual tests to be traceable

D. Configuration management tools – Check for consistence



68: Use cases can be performed to test

A. Performance testing

B. Unit testing

C. Business scenarios

D. Static testing



69: Purpose of test design technique is

A. Identifying test conditions only, not Identifying test cases

B. Not Identifying test conditions, Identifying test cases only

C. Identifying test conditions and Identifying test cases

D. Identifying test conditions or Identifying test cases



70: One person has been dominating the current software process improvement

meeting. Which of the following techniques should the facilitator use to bring other

team members into the discussion?

A. Confront the person and ask that other team members be allowed to express their

opinions.

B. Wait for the person to pause, acknowledge the person’ s opinion, and ask for someone

else’ s opinion.

C. Switch the topic to an issue about which the person does not have a strong opinion.

D. Express an opinion that differs from the person’ s opinion in order to encourage others to

express their ideas.



71: Stochastic testing using statistical information or operational profiles uses the

following method

A. Heuristic testing approach

B. Methodical testing approach

C. Model based testing approach

D. Process or standard compliant testing approach



72: A software model that can’t be used in functional testing

A. Process flow model

B. State transaction model

C. Menu structure model

D. Plain language specification model



73: Arc testing is known as

A. Branch testing

B. Agile testing

C. Beta testing

D. Ad-hoc testing



74: The purpose of exit criteria is

A. Define when to stop testing

B. End of test level

C. When a set of tests has achieved a specific pre condition

D. All of the above



75: The ___________ technique can be used to achieve input and output coverage

A. Boundary value analysis

B. Equivalence partitioning

C. Decision table testing

D. State transition testing

76: The __________ testing is performed at the developing organization’s site

A. Unit testing

B. Regression testing

C. Alpha testing

D. Integration testing



77: What is the main purpose of Informal review

A. Inexpensive way to get some benefit

B. Find defects

C. Learning, gaining understanding, effect finding

D. Discuss, make decisions, solve technical problems



78: Which is not a Component testing

A. Check the memory leaks

B. Check the robustness

C. Check the branch coverage

D. Check the decision tables



79: The software engineer's role in tool selection is

A. To identify, evaluate, and rank tools, and recommend tools to management

B. To determine what kind of tool is needed, then find it and buy it

C. To initiate the tool search and present a case to management

D. To identify, evaluate and select the tools



80: Which is not the fundamental test process

A. Planning and control

B. Test closure activities

C. Analysis and design

D. None



81: The ________ and ________ are used within individual workbenches to produce

the right output products.

A. Tools and techniques

B. Procedures and standards

C. Processes and walkthroughs

D. Reviews and update



82: Which is not the software characteristics

A. Reliability

B. Usability

C. Scalability

D. Maintainability



83: The principle of Cyclomatic complexity, considering L as edges or links, N as

nodes, P as independent paths

A. L-N +2P

B. N-L +2P

C. N-L +P

D. N-L +P



84: FPA is used to

A. To measure the functional requirements of the project

B. To measure the size of the functionality of an Information system

C. To measure the functional testing effort

D. To measure the functional flow

85: A _____ is the step-by-step method followed to ensure that standards are met

A. SDLC

B. Project Plan

C. Policy

D. Procedure



86: Which is not a test Oracle

A. The existing system (For a bench mark)

B. The code

C. Individual’s knowledge

D. User manual



87: PDCA is known as

A. Plan, Do, Check, Act

B. Plan, Do, Correct, Act

C. Plan, Debug, Check, Act

D. Plan, Do, Check, Accept



88: Which is the non-functional testing

A. Performance testing

B. Unit testing

C. Regression testing

D. Sanity testing



89: A Test Plan Outline contains which of the following:

i. Test Items

ii. Test Scripts

iii. Test Deliverables

iv. Responsibilities

A. i,ii,iii are true and iv is false

B. i,iii,iv are true and ii is false

C. ii,iii are true and i and iv are false

D. i,ii are false and iii , iv are true



90: Testing where in we subject the target of the test , to varying workloads to

measure and evaluate the performance behaviors and ability of the target and of the

test to continue to function properly under these different workloads.

A. Load Testing

B. Integration Testing

C. System Testing

D. Usability Testing



91: Which of the following is the task of a Tester?

i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the

project.

ii. Prepare and acquire Test Data

iii. Implement Tests on all test levels, execute and log the tests.

iv. Create the Test Specifications

A. i, ii, iii is true and iv is false

B. ii,iii,iv is true and i is false

C. i is true and ii,iii,iv are false

D. iii and iv is correct and i and ii are incorrect



92: What can static analysis NOT find?

A. The use of a variable before it has been defined

B. Unreachable ("dead") code

C. Memory leaks

D. Array bound violations



93: White Box Techniques are also called as:

A. Structural Testing

B. Design Based Testin

C. Error Guessing Technique

D. Experience Based Technique



94: Reviewing the test Basis is a part of which phase

A. Test Analysis and Design

B. Test Implementation and execution

C. Test Closure Activities

D. Evaluating exit criteria and reporting



95: Component Testing is also called as :-

i. Unit Testing

ii. Program Testing

iii. Module Testing

iv. System Component Testing .

A. i,ii,iii are true and iv is false

B. i,ii,iii,iv are false

C. i,ii,iv are true and iii is false

D. all of above is true



96: Which of the following is not a major task of Exit criteria?

A. Checking test logs against the exit criteria specified in test planning.

B. Logging the outcome of test execution.

C. Assessing if more tests are needed.

D. Writing a test summary report for stakeholders.



97: Which of the following is true about Formal Review or Inspection:-

i. Led by Trained Moderator (not the author).

ii. No Pre Meeting Preparations

iii. Formal Follow up process.

iv. Main Objective is to find defects

A. ii is true and i,iii,iv are false

B. i,iii,iv are true and ii is false

C. i,iii,iv are false and ii is true

D. iii is true and I,ii,iv are false



98: The Phases of formal review process is mentioned below arrange them in the

correct order.

i. Planning

ii. Review Meeting

iii. Rework

iv. Individual Preparations

v. Kick Off

vi. Follow Up

A. i,ii,iii,iv,v,vi

B. vi,i,ii,iii,iv,v

C. i,v,iv,ii,iii,vi

D. i,ii,iii,v,iv,vi



99: Testing activity which is performed to expose defects in the interfaces and in the

interaction between integrated components is :

A. System Level Testing

B. Integration Level Testing

C. Unit Level Testing

D. Component Testing



100: Methodologies adopted while performing Maintenance Testing:-

A. Breadth Test and Depth Test

B. Re-testing

C. Confirmation Testing

D. Sanity Testing



101: The Switch is switched off once the temperature falls below 18 and then it is

turned on when the temperature is more than 21. When the temperature is more than

21. Identify the Equivalance values which belong to the same class.

A. 12,16,22

B. 24,27,17

C. 22,23,24

D. 14,15,19



102: What is an equivalence partition (also known as an equivalence class)?

A. A set of test cases for testing classes of objects

B. An input or output range of values such that only one value in the range becomes a test

case

C. An input or output range of values such that each value in the range becomes a test case

D. An input or output range of values such that every tenth value in the range becomes a

test case.



103: Which of the following is not a part of the Test Implementation and Execution

Phase

A. Creating test suites from the test cases

B. Executing test cases either manually or by using test execution tools

C. Comparing actual results

D. Designing the Tests



104: Link Testing is also called as :

A. Component Integration testing

B. Component System Testing

C. Component Sub System Testing

D. Maintenance testing



105: Who are the persons involved in a Formal Review :-

i. Manager

ii. Moderator

iii. Scribe / Recorder

iv. Assistant Manager

A. i,ii,iii,iv are true

B. i,ii,iii are true and iv is false.

C. ii,iii,iv are true and i is false.

D. i,iv are true and ii, iii are false.



106: Which of the following statements regarding static testing is false:

A. Static testing requires the running of tests through the code

B. Static testing includes desk checking

C. Static testing includes techniques such as reviews and inspections

D. Static testing can give measurements such as cyclomatic complexity



107: Designing the test environment set-up and identifying any required

infrastructure and tools are a part of which phase

A. Test Implementation and execution

B. Test Analysis and Design

C. Evaluating the Exit Criteria and reporting

D. Test Closure Activities



108: A Type of functional Testing, which investigates the functions relating to

detection of threats, such as virus from malicious outsiders.

A. Security Testing

B. Recovery Testing

C. Performance Testing

D. Functionality Testing



109: A Person who documents all the issues, problems and open points that were

identified during a formal review.

A. Moderator.

B. Scribe

C. Author

D. Manager



110: The Test Cases Derived from use cases

A. Are most useful in uncovering defects in the process flows during real world use of the

system

B. Are most useful in uncovering defects in the process flows during the testing use of the

system

C. Are most useful in covering the defects in the process flows during real world use of the

system

D. Are most useful in covering the defects at the Integration Level



111: One of the fields on a form contains a text box which accepts alpha numeric

values. Identify the Valid Equivalence class

A. BOOK

B. Book

C. Boo01k

D. book



112: In a Examination a candidate has to score minimum of 24 marks inorder to clear

the exam. The maximum that he can score is 40 marks. Identify the Valid Equivalance

values if the student clears the exam.

A. 22,23,26

B. 21,39,40

C. 29,30,31

D. 0,15,22



113: Verification involves which of the following :-

i. Helps to check the Quality of the built product

ii. Helps to check that we have built the right product.

iii. Helps in developing the product

iv. Monitoring tool wastage and obsoleteness.

A. Options i,ii,iii,iv are true.

B. i is true and ii,iii,iv are false

C. i,ii,iii are true and iv is false

D. ii is true and i,iii,iv are false.



114: A Project risk includes which of the following :

A. Organizational Factors

B. Poor Software characteristics

C. Error Prone software delivered.

D. Software that does not perform its intended functions



115: Which of the following is a Key Characteristics of Walk Through

A. Scenario , Dry Run , Peer Group

B. Pre Meeting Preparations

C. Formal Follow Up Process

D. Includes Metrics



116: Which of the following techniques is NOT a White box technique?

A. Statement Testing and coverage

B. Decision Testing and coverage

C. Condition Coverage

D. Boundary value analysis



117: Reporting Discrepancies as incidents is a part of which phase :-

A. Test Analysis and Design

B. Test Implementation and execution

C. Test Closure Activities

D. Evaluating exit criteria and reporting



118: In a risk-based approach the risks identified may be used to :

i. Determine the test technique to be employed

ii. Determine the extent of testing to be carried out

iii. Prioritize testing in an attempt to find critical defects as early as possible.

iv. Determine the cost of the project

A. ii is True; i, iii, iv & v are False

B. i,ii,iii are true and iv is false

C. ii & iii are True; i, iv are False

D. ii, iii & iv are True; i is false



119: Incidents would not be raised against:

A. Requirements

B. Documentation

C. Test cases

D. Improvements suggested by users



120: The Planning phase of a formal review includes the following :-

A. Explaining the objectives

B. Selecting the personnel, allocating roles.

C. Follow up

D. Individual Meeting preparations



121: Test Implementation and execution has which of the following major tasks?

i. Developing and prioritizing test cases, creating test data, writing test procedures and

optionally preparing the test harnesses and writing automated test scripts.

ii. Creating the test suite from the test cases for efficient test execution.

iii. Verifying that the test environment has been set up correctly.

iv. Determining the exit criteria.

A. i,ii,iii are true and iv is false

B. i,,iv are true and ii is false

C. i,ii are true and iii,iv are false

D. ii,iii,iv are true and i is false



122: One of the fields on a form contains a text box which accepts numeric values in

the range of 18 to 25. Identify the invalid Equivalance class

A. 17

B. 19

C. 24

D. 21



123: Exhaustive Testing is

A. Is impractical but possible

B. Is practically possible

C. Is impractical and impossible

D. Is always possible



124: Hand over of Testware is a part of which Phase

A. Test Analysis and Design

B. Test Planning and control

C. Test Closure Activities

D. Evaluating exit criteria and reporting



125: Which one is not comes under international standard

A. IEC

B. IEEE

C. ISO

D. All of the above



126: In which phase static tests are used

A. Requirements

B. Design

C. Coding

D. All of the above



127: What's the disadvantage of Black Box Testing

A. Chances of having repetition of tests that are already done by programmer.

B. The test inputs needs to be from large sample space.

C. It is difficult to identify all possible inputs in limited testing time. So writing test cases is

slow and difficult

D. All above



128: Static analysis tools are typically used by

A. Testers

B. Developers

C. Testers & Developers

D. None



129: Majority of system errors occur in the _________ phase

A. Requirements Phase.

B. Analysis and Design Phase

C. Development Phase

D. Testing Phase



130: The specification which describes steps required to operate the system and

exercise test cases in order to implement the associated test design

A. Test Case Specification

B. Test Design Specification

C. Test Procedure Specification

D. None



131: How much percentage of the life cycle costs of a software are spent on

maintenance.

A. 10%

B. 30%

C. 50%

D. 70%



132: When a defect is detected and fixed then the software should be retested to

confirm that the original defect has been successfully removed. This is called

A. Regression testing

B. Maintenance testing

C. Confirmation testing

D. None of the above



133: Equivalence testing divides the input domain into classes of data from which

test cases can be derived to reduce the total number of test cases that must be

developed.

A. True

B. False



134: When to stop Testing?

A. Stop when scheduled time for testing expires

B. Stop if 75% of the pre-defined number of errors is detected.

C. Stop when all the test cases execute with detecting few errors.

D. None above



135: With thorough testing it is possible to remove all defects from a program prior

to delivery to the customer.

A. True

B. False



136: Structure is unknown for which type of development project

A. Traditional system development

B. Iterative development

C. System maintenance

D. Purchased/contracted software



137: ________indicates how important it is to fix the bug and when it should be

fixed

A. Severity

B. Priority

C. All of the above

D. None of the above



138: The person who leads the review of the document(s), planning the

review,running the meeting and follow-up after the meeting

A. Reviewer

B. Author

C. Moderator

D. Auditor



139: Performs sufficient testing to evaluate every possible path and condition in the

application system. The only test method that guarantees the proper functioning of the

application system is called as _____________

A. Regression Testing

B. Exhaustive Testing

C. Basic Path Testing

D. Branch Testing



140: Quality Assurance is the process by which product quality is compared with the

application standards and the action taken when nonconformance is detected.

A. True

B. False



141: A formal assessment of a work product conducted by one or more qualified

independent reviewer to detect defects.

A. Inspection.

B. Walkthrough.

C. Review

D. Non Conformance



142: Test Case are grouped into Manageable (and scheduled) units are called as

A. Test Harness

B. Test Suite

C. Test Cycle

D. Test Driver



143: Configuration and compatibility testing are typically good choices for

outsourcing

A. True

B. False



144: What type of tools to be used for Regression Testing

A. Performance

B. Record/Playback

C. A. & B.

D. None



145: System Integration testing should be done after

A. Integration testing

B. System testing

C. Unit testing

D. Component integration testing



146: During this event the entire system is tested to verify that all functional

information structural and quality requirements have been met. A predetermined

combination of tests is designed that when executed successfully satisfy management

that the system meets specifications

A. Validation Testing

B. Integration Testing

C. User Acceptance Testing

D. System Testing



147: What is the normal order of activities in which software testing is organized?

A. Unit, integration, system, validation

B. System, integration, unit, validation

C. Unit, integration, validation, system

D. None of the above



148: The goal of a software tester is to find bugs, find them as early as possible and

make sure they get fixed.

A. True

B. False



149: Beta testing is performed at developing organization's site where as Alpha

testing is performed by people at their own locations.

A. True

B. False



150: The principal attributes of tools and automation are

A. Speed & efficiency

B. Accuracy & precision

C. All of the above

D. None of the above



151: In ______ testing doesn't know anything about the sofware being tested; it just

clicks or types randomly.

A. Random testing

B. Gorilla testing

C. Adhoc testing

D. Dumb monkey testing



152: A series of probing questions about the completeness and attributes of an

application system is called

A. Checklist

B. Checkpoint review

C. Decision table

D. Decision tree



153: The testing technique that requires devising test cases to demonstrate that

each program function is operational is called

A. Black-box testing

B. Glass-box testing

C. Grey-box testing

D. White-box testing



154: A white box testing technique that measures the number of or percentage of

decision directions executed by the test case designed is called

A. Condition coverage

B. Decision/Condition coverage

C. Decision Coverage

D. Branch coverage



155: Which summarizes the testing activities associated with one or more test design

specifications.

A. Test Summary report

B. Test Log

C. Test Incident Report

D. Test Script



156: Testing with out a real plan and test cases is called ---

A. Gorilla testing

B. Monkey testing

C. Adhoc testing

D. All of the above



157: Which rule should not be followed for reviews

A. Defects and issues are identified and corrected

B. The product is reviewed not the producer

C. All members of the reviewing team are responsible for the result of the review

D. Each review has a clear predefined objective



158: Verification can be termed as 'Are we building the product right?"

A. True

B. False



159: Which testing is used to verify that the system can perform properly when

internal program or system limitations have been exceeded

A. Stress Testing

B. Load Testing

C. Performance Testing

D. Volume testing



160: Defects are recorded into three major purposes. They are:

1.To correct the defect

2.To report status of the application

3.To improve the software development process

A. True

B. False



161: Drivers are tools used to control and operate tge software being testeD.

A. True

B. False



162: Typical defects discovered by static analysis includes

A. Programming standard violations

B. Referring a variable with an undefined value

C. Security vulnerabilities

D. All Above



163: EULA stands for

A. End Usability License Agreement

B. End User License Agreement

C. End User License Arrangement

D. End User License Attachment



164: ________is a very early build intended for limited distribution to a few key

customers and to marketing for demonstration purposes.

A. Alpha release

B. Beta release

C. Test release document

D. Build



165: CAST stands for

A. Computer Aided Software Testing

B. Computer Aided Software Tools

C. Computer Analysis Software Techniques

D. None



166: The tool modifies the program code or manipulates tge operating environment

in any way is considered non-invasive

A. True

B. False



167: Which test may not mimic real world situations

A. Functional testing

B. Structural Testing

C. All of the above

D. None of the above



168: _______ includes both Black box and White Box Testing features

A. Gray Box Testing

B. Hybrid Testing

C. A. & B.

D. None



169: Exhaustive testing is possible

A. True

B. False



170: Tool which stores requirement statements, check for consistency and allow

requirements to be prioritized and enable individual tests to be traceable to

requirements, functions and features.

A. Incident management tools

B. Requirements management tools

C. Configuration management tools

D. None



171: The number of tests to test all control statements equals the cyclomatic

complexity

A. True

B. False



172: Boundary value analysis can only be used during white-box testing.

A. True

B. False



173: Which of these are objectives for software testing?

A. Determine the productivity of programmers

B. Eliminate the need for future program maintenance

C. Eliminate every error prior to release

D. Uncover software errors



174: Failure is _________

A. Incorrect program behaviour due to a fault in the program

B. Bug found before product Release

C. Bug found after product Release

D. Bug found during Design phase

175: During the software development process, at what point can the test process

start?

A. When the code is complete.

B. When the design is complete.

C. When the software requirements have been approved.

D. When the first code module is ready for unit testing



176: "How much testing is enough?"

A. This question is impossible to answer

B. This question is easy to answer

C. The answer depends on the risk for your industry, contract and special requirements

D. This answer depends on the maturity of your developers



177: Which of the following tools would be involved in the automation of regression

test?

A. Data tester

B. Boundary tester

C. Capture/Playback

D. Output comparator.



178: Incorrect form of Logic coverage is:

A. Statement Coverage

B. Pole Coverage

C. Condition Coverage

D. Path Coverage



179: Code Coverage is used as a measure of what?

A. Defects

B. Trends analysis

C. Test Effectiveness

D. Time Spent Testing



180: Fault Masking is

A. Error condition hiding another error condition

B. Creating a test case which does not reveal a fault

C. Masking a fault by developer

D. Masking a fault by a tester



181: Which of the following is not a quality characteristic listed in ISO 9126

Standard?

A. Functionality

B. Usability

C. Supportability

D. Maintainability



182: One Key reason why developers have difficulty testing their own work is :

A. Lack of technical documentation

B. Lack of test tools on the market for developers

C. Lack of training

D. Lack of Objectivity



183: Statement Coverage will not check for the following.

A. Missing Statements

B. Unused Branches

C. Dead Code

D. Unused Statement



184: Given the Following program

IF X <>= Z

THEN Statement 2;

END

McCabe’s Cyclomatic Complexity is :

A. 2

B. 3

C. 4

D. 5



185: To test a function, the programmer has to write a _________, which calls the

function to be tested and passes it test data.

A. Stub

B. Driver

C. Proxy

D. None of the above



186: Pick the best definition of quality

A. Quality is job one

B. Zero defects

C. Conformance to requirements

D. Work as designed



187: Boundary value testing

A. Is the same as equivalence partitioning tests

B. Test boundary conditions on, below and above the edges of input and output equivalence

classes

C. Tests combinations of input circumstances

D. Is used in white box testing strategy



188: An input field takes the year of birth between 1900 and 2004

The boundary values for testing this field are

A. 0,1900,2004,2005

B. 1900, 2004

C. 1899,1900,2004,2005

D. 1899, 1900, 1901,2003,2004,2005



189: How many test cases are necessary to cover all the possible sequences of

statements (paths) for the following program fragment? Assume that the two conditions

are independent of each other:

if (Condition 1)

then statement 1

else statement 2

fi

if (Condition 2)

then statement 3

fi

A. 2 Test Cases

B. 3 Test Cases

C. 4 Test Cases

D. Not achievable



190: A common test technique during component test is

A. Statement and branch testing

B. Usability testing

C. Security testing

D. Performance testing



191: In a review meeting a moderator is a person who

A. Takes minutes of the meeting

B. Mediates between people

C. Takes telephone calls

D. Writes the documents to be reviewed



192: Acceptance test cases are based on what?

A. Requirements

B. Design

C. Code

D. Decision table



193: Which one of the following are non-functional testing methods?

A. System testing

B. Usability testing

C. Performance testing

D. Both B & C



194: Independent Verification & Validation is

A. Done by the Developer

B. Done by the Test Engineers

C. Done By Management

D. Done by an Entity Outside the Project’s sphere of influence



195: Defect Management process does not include

A. Defect prevention

B. Deliverable base-lining

C. Management reporting

D. None of the above



196: Which of the following could be a reason for a failure

1) Testing fault

2) Software fault

3) Design fault

4) Environment Fault

5) Documentation Fault

A. 2 is a valid reason; 1,3,4 & 5 are not

B. 1,2,3,4 are valid reasons; 5 is not

C. 1,2,3 are valid reasons; 4 & 5 are not

D. All of them are valid reasons for failure



197: Test are prioritized so that:

A. You shorten the time required for testing

B. You do the best testing in the time available

C. You do more effective testing

D. You find more faults



198: When a new testing tool is purchased, it should be used first by:

A. A small team to establish the best way to use the tool

B. Everyone who may eventually have some use for the tool

C. The independent testing team

D. The vendor contractor to write the initial scripts



199: During which test activity could faults be found most cost effectively?

A. Execution

B. Design

C. Planning

D. Check Exit criteria completion



200: What is the difference between testing software developed by contractor

outside your country, versus testing software developed by a contractor within your

country?

A. Does not meet people needs

B. Cultural difference

C. Loss of control over reallocation of resources

D. Relinquishments of control



201: The inputs for developing a test plan are taken from

A. Project plan

B. Business plan

C. Support plan

D. None of the above



202: To test a function, the programmer has to write a ______, which calls the

function and passes it the test data.

A. Stub

B. Driver

C. Proxy

D. None of the above



203: Which of the following is not a static testing technique

A. Error guessing

B. Walkthrough

C. Data flow analysis

D. Inspections



204: Which of the following statements about component testing is not true?

A. Component testing should be performed by development

B. Component testing is also know as isolation or module testing

C. Component testing should have completion criteria planned

D. Component testing does not involve regression testing



205: Inspections can find all the following except

A. Variables not defined in the code

B. Spelling and grammar faults in the documents

C. Requirements that have been omitted from the design documents

D. How much of the code has been covered



206: Which of the following is not a characteristic for Testability?

A. Operability

B. Observability

C. Simplicity

D. Robustness



207: Software testing accounts to what percent of software development costs?

A. 10-20

B. 40-50

C. 70-80

D. 5-10



208: Equivalence partitioning is:

A. A black box testing technique used only by developers

B. A black box testing technique than can only be used during system testing

C. A black box testing technique appropriate to all levels of testing

D. A white box testing technique appropriate for component testing



209: If an expected result is not specified then:

A. We cannot run the test

B. It may be difficult to repeat the test

C. It may be difficult to determine if the test has passed or failed

D. We cannot automate the user inputs



210: How much testing is enough

A. This question is impossible to answer

B. The answer depends on the risks for your industry, contract and special requirements

C. The answer depends on the maturity of your developers

D. The answer should be standardized for the software development industry



211: The purpose of requirement phase is

A. To freeze requirements

B. To understand user needs

C. To define the scope of testing

D. All of the above



212: Which of these can be successfully tested using Loop Testing methodology?

A. Simple Loops

B. Nested Loops

C. Concatenated Loops

D. All of the above



213: Cyclomatic Complexity method comes under which testing method.

A. White box

B. Black box

C. Green box

D. Yellow box



214: A reliable system will be one that:

A. Is unlikely to be completed on schedule

B. Is unlikely to cause a failure

C. Is likely to be fault-free

D. Is likely to be liked by the users



215: Which, in general, is the least required skill of a good tester?

A. Being diplomatic

B. Able to write software

C. Having good attention to detail

D. Able to be relied on



216: A regression test:

A. Will always be automated

B. Will help ensure unchanged areas of the software have not been affected

C. Will help ensure changed areas of the software have not been affected

D. Can only be run during user acceptance testing



217: Function/Test matrix is a type of

A. Interim Test report

B. Final test report

C. Project status report

D. Management report



218: The process starting with the terminal modules is called:

A. Top-down integration

B. Bottom-up integration

C. None of the above

D. Module integration



219: Verification is:

A. Checking that we are building the right system

B. Checking that we are building the system right

C. Performed by an independent test team

D. Making sure that it is what the user really wants



220: The difference between re-testing and regression testing is

A. Re-testing is running a test again; regression testing looks for unexpected side effects

B. Re-testing looks for unexpected side effects; regression testing is repeating those tests

C. Re-testing is done after faults are fixed; regression testing is done earlier

D. Re-testing uses different environments, regression testing uses the same environment

E. Re-testing is done by developers, regression testing is done by independent testers



221: Testing should be stopped when:

A. All the planned tests have been run

B. Time has run out

C. All faults have been fixed correctly

D. Both A. and C.

E. I depends on the risks for the system being tested



222: Which of the following is the main purpose of the integration strategy for

integration testing in the small?

A. To ensure that all of the small modules are tested adequately

B. To ensure that the system interfaces to other systems and networks

C. To specify which modules to combine when and how many at once

D. To ensure that the integration testing can be performed by a small team

E. To specify how the software should be divided into modules



223: Which of the following is NOT part of configuration management:

A. Status accounting of configuration items

B. Auditing conformance to ISO9001

C. Identification of test versions

D. Record of changes to documentation over time

E. controlled library access



224:Regression testing should be performed:

v) Every week

w) After the software has changed

x) As often as possible

y) When the environment has changed

z) Wwhen the project manager says

A. v & w are true, x – z are false

B. w, x & y are true, v & z are false

C. w & y are true, v, x & z are false

D. w is true, v, x y and z are false

E. All of the above are true



225: A tool that supports traceability, recording of incidents or scheduling of tests is

called:

A. A dynamic analysis tool

B. A test execution tool

C. A debugging tool

D. A test management tool

E. A configuration management tool



226: The cost of fixing a fault:

A. Is not important

B. Increases as we move the product towards live use

C. Decreases as we move the product towards live use

D. Is more expensive if found in requirements than functional design

E. Can never be determined



227: Order numbers on a stock control system can range between 10000 and 99999

inclusive. Which of the following inputs might be a result of designing tests for only

valid equivalence classes and valid boundaries:

A. 1000, 5000, 99999

B. 9999, 50000, 100000

C. 10000, 50000, 99999

D. 10000, 99999

E. 9999, 10000, 50000, 99999, 10000



228: When what is visible to end-users is a deviation from the specific or expected

behavior, this is called:

A. An error

B. A fault

C. A failure

D. A defect

E. A mistake



229: Which expression best matches the following characteristics or review

processes:

1. Led by author

2. Undocumented

3. No management participation

4. Led by a trained moderator or leader

5. Uses entry exit criteria

s) Inspection

t) Peer review

u) Informal review

v) Walkthrough

A. s = 4, t = 3, u = 2 and 5, v = 1

B. s = 4 and 5, t = 3, u = 2, v = 1

C. s = 1 and 5, t = 3, u = 2, v = 4

D. s = 5, t = 4, u = 3, v = 1 and 2

E. s = 4 and 5, t = 1, u = 2, v = 3



230: Given the following:

Switch PC on

Start "outlook"

IF outlook appears THEN

Send an email

Close outlook

A. 1 test for statement coverage, 1 for branch coverage

B. 1 test for statement coverage, 2 for branch coverage

C. 1 test for statement coverage. 3 for branch coverage

D. 2 tests for statement coverage, 2 for branch coverage

E. 2 tests for statement coverage, 3 for branch coverage



231: Test managers should not:

A. Report on deviations from the project plan

B. Sign the system off for release

C. Re-allocate resource to meet original plans

D. Rise incidents on faults that they have found

E. Provide information for risk analysis and quality improvement



232: Which of the following is NOT part of system testing:

A. Business process-based testing

B. Performance, load and stress testing

C. Requirements-based testing

D. Usability testing

E. Top-down integration testing



233: When a new testing tool is purchased, it should be used first by:

A. A small team to establish the best way to use the tool

B. Everyone who may eventually have some use for the tool

C. The independent testing team

D. The managers to see what projects it should be used in

E. The vendor contractor to write the initial scripts



234: Which of the following is not part of performance testing:

A. Measuring response time

B. Measuring transaction rates

C. Recovery testing

D. Simulating many users

E. Generating many transactions



235: What is the purpose of test completion criteria in a test plan:

A. To know when a specific test has finished its execution

B. To ensure that the test case specification is complete

C. To set the criteria used in generating test inputs

D. To know when test planning is complete

E. To plan when to stop testing



236: Given the following code, which is true:

IF A > B THEN

C = A – B

ELSE

C = A + B

ENDIF

Read D

IF C = D Then

Print "Error"

ENDIF

A. 1 test for statement coverage, 3 for branch coverage

B. 2 tests for statement coverage, 2 for branch coverage

C. 2 tests for statement coverage. 3 for branch coverage

D. 3 tests for statement coverage, 3 for branch coverage

E. 3 tests for statement coverage, 2 for branch coverage



237: Unreachable code would best be found using:

A. Code reviews

B. Code inspections

C. A coverage tool

D. A test management tool

E. A static analysis tool



238: What information need not be included in a test incident report:

A. How to fix the fault

B. How to reproduce the fault

C. Test environment details

D. Severity, priority

E. The actual and expected outcomes



239: Which of the following is NOT included in the Test Plan document of the Test

Documentation Standard:

A. Test items (i.e. software versions)

B. What is not to be tested

C. Test environments

D. Quality plans

E. Schedules and deadlines



240: IEEE 829 test plan documentation standard contains all of the following except:

A. Test items

B. Test deliverables

C. Test tasks

D. Test environment

E. Test specification



251: Which of the following is NOT a black box technique:

A. Equivalence partitioning

B. State transition testing

C. LCSAJ

D. Syntax testing

E. Boundary value analysis



252: Expected results are:

A. Only important in system testing

B. Only used in component testing

C. Never specified in advance

D. Most useful when specified in advance

E. Derived from the code



253: Beta testing is:

A. Performed by customers at their own site

B. Performed by customers at their software developer’s site

C. Performed by an independent test team

D. Useful to test bespoke software

E. Performed as early as possible in the lifecycle



254: Consider the following:

Pick up and read the newspaper

Look at what is on television

If there is a program that you are interested in watching then switch the the television on

and watch the program

Otherwise

Continue reading the newspaper

If there is a crossword in the newspaper then try and complete the crossword

A. SC = 1 and DC = 1

B. SC = 1 and DC = 2

C. SC = 1 and DC = 3

D. SC = 2 and DC = 2

E. SC = 2 and DC = 3



255: A typical commercial test execution tool would be able to perform all of the

following EXCEPT:

A. Generating expected outputs

B. Replaying inputs according to a programmed script

C. Comparison of expected outcomes with actual outcomes

D. Recording test inputs

E. Reading test values from a data file



256: Consider the following statements about early test design:

i. Early test design can prevent fault multiplication

ii. Faults found during early test design are more expensive to fix

iii. Early test design can find faults

iv. Early test design can cause changes to the requirements

v. Early test design takes more effort

A. i, iii & iv are true. Ii & v are false

B. iii is true, I, ii, iv & v are false

C. iii & iv are true. i, ii & v are false

D. i, iii, iv & v are true, ii us false

E. i & iii are true, ii, iv & v are false



257: Given the following code, which is true about the minimum number of test

cases required for full statement and branch coverage:

Read P

Read Q

IF P+Q > 100 THEN

Print "Large"

ENDIF

If P > 50 THEN

Print "P Large"

ENDIF

A. 1 test for statement coverage, 3 for branch coverage

B. 1 test for statement coverage, 2 for branch coverage

C. 1 test for statement coverage, 1 for branch coverage

D. 2 tests for statement coverage, 3 for branch coverage

E. 2 tests for statement coverage, 2 for branch coverage



258: The place to start if you want a (new) test tool is:

A. Attend a tool exhibition

B. Invite a vendor to give a demo

C. Analyse your needs and requirements

D. Find out what your budget would be for the tool

E. Search the internet



259: Error guessing is best used

A. As the first approach to deriving test cases

B. After more formal techniques have been applied

C. By inexperienced testers

D. After the system has gone live

E. Only by end users



260: Exit Criteria may consist of:

i. Thoroughness measures, such as coverage of code, functionality or risk

ii. Estimates of Defect density or reliability measures.

iii. Residual risk such as defects not fixed or lack of test coverage in certain areas

iv. Verifying the Test Environment.

A. iv is correct and i,ii,iii are incorrect.

B. i,ii,iii is correct and iv is incorrect

C. ii is correct and i,ii,iii are incorrect

D. iii and iv are correct and i,ii are incorrect



261: One of the fields on a form contains a text box, which accepts alphabets in

lower or upper case. Identify the invalid Equivalance class value.

A. CLASS

B. cLASS

C. CLass

D. CLa01ss



262: The Kick Off phase of a formal review includes the following:

A. Explaining the objective

B. Fixing defects found typically done by author

C. Follow up

D. Individual Meeting preparations



263: Peer Reviews are also called as :

A. Inspection

B. Walkthrough

C. Technical Review

D. Formal Review



264: Validation involves which of the following

i. Helps to check the Quality of the Built Product

ii. Helps to check that we have built the right product.

iii. Helps in developing the product

iv. Monitoring tool wastage and obsoleteness.



A. Options i,ii,iii,iv are true.

B. ii is true and i,iii,iv are false

C. i,ii,iii are true and iv is false

D. iii is true and i,ii,iv are false.





265: Success Factors for a review include:

i. Each Review does not have a predefined objective

ii. Defects found are welcomed and expressed objectively

iii. Management supports a good review process.

iv. There is an emphasis on learning and process improvement.

A. ii,iii,iv are correct and i is incorrect

B. iii , i , iv is correct and ii is incorrect

C. i , iii , iv , ii is in correct

D. ii is correct



266: Which of the following helps in monitoring the Test Progress:

i. Percentage of Test Case Execution

ii. Percentage of work done in test environment preparation.

iii. Defect Information e.g. defect density, defects found and fixed

iv. The size of the testing Team and skills of the engineers

A. iv is correct and i,ii,iii are incorrect

B. i,ii,iii are correct and iv is incorrect

C. i,ii are correct and iii,iv are incorrect

D. i,iv are correct and ii , iii are incorrect



267: Defects discovered by static analysis tools include:

i. Variables that are never used.

ii. Security vulnerabilities.

iii. Programming Standard Violations

iv. Uncalled functions and procedures

A. i , ii,iii,iv is correct

B. iii ,is correct I,ii,iv are incorrect.

C. i ,ii, iii and iv are incorrect

D. iv, ii is correct



268: Which of the following is true about White and Black Box Testing Technique:-

A. Equivalence partitioning, Decision Table and Control flow are White box Testing

Techniques.

B. Equivalence partitioning, Boundary Value Analysis , Data Flow are Black Box Testing

Techniques.

C. Equivalence partitioning , State Transition , Use Case Testing are black box Testing

Techniques.

D. Equivalence Partitioning, State Transition, Use Case Testing and Decision Table are

White Box Testing Techniques.



269: Which of the following techniques is NOT a black box technique?

A. State transition testing

B. LCSAJ (Linear Code Sequence and Jump)

C. Syntax testing

D. Boundary value analysis



270: Features of White Box Testing Technique:

i. We use explicit knowledge of the internal workings of the item being tested to select the

test data.

ii. Uses specific knowledge of programming code to examine outputs and assumes that the

tester knows the path of logic in a unit or a program.

iii. Checking for the performance of the application

iv. Also checks for functionality.

A. i, ii are true and iii and iv are false

B. iii is true and i,ii, iv are false

C. ii ,iii is true and i,iv is false

D. iii and iv are true and i,ii are false



271. The Provision and Management of a controlled library containing all the

configurations items is called as

A. Configuration Control

B. Status Accounting

C. Configuration Identification

D. Configuration Identification



272: The selection of a test approach should consider the context:

i. Risk of Failure of the Project, hazards to the product and risks of product failure to

humans

ii. Skills and experience of the people in the proposed technique, tools and methods

iii. The objective of the testing endeavor and the mission of the testing team.

iv. The size of the testing Team

A. i,ii,iii,iv are true

B. i,ii,iii are true and iv is false.

C. ii,iii,iv are true and i is false.

D. i,iv are true and ii, iii are false.



273: Benefits of Independent Testing

A. Independent testers are much more qualified than Developers

B. Independent testers see other and different defects and are unbiased.

C. Independent Testers cannot identify defects.

D. Independent Testers can test better than developers



274: Minimum Test Required for Statement Coverage:

Disc = 0

Order-qty = 0

Read Order-qty

If Order-qty >=20 then

Disc = 0.05

If Order-qty >=100 then

Disc =0.1

End if

End if

A. Statement coverage is 4

B. Statement coverage is 1

C. Statement coverage is 3

D. Statement Coverage is 2



275: Test Conditions are derived from:

A. Specifications

B. Test Cases

C. Test Data

D. Test Design



276: Which of the following is the task of a Test Lead / Leader.

i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the

project.

ii. Write Test Summary Reports based on the information gathered during testing

iii. Decide what should be automated , to what degree and how.

iv. Create the Test Specifications

A. i, ii, iii is true and iv is false

B. ii,iii,iv is true and i is false

C. i is true and ii,iii,iv are false

D. iii and iv is correct and i and ii are incorrect



277: Impact Analysis helps to decide:

A. How much regression testing should be done.

B. Exit Criteria

C. How many more test cases need to written.

D. Different Tools to perform Regression Testing



278: Drivers are also known as:

i. Spade

ii. Test harness

iii. Scaffolding

A. i , ii are true and iii is false

B. i , iii are true and ii is false

C. ii , iii are true and i is false

D. All of the above are true



279: Which of the following is not a type of incremental testing approach?

A. Top down

B. Big-bang

C. Bottom up

D. Functional incrementation.



280: In a system designed to work out the tax to be paid:

An employee has £4000 of salary tax free. The next £1500 is taxed at 10% The next £28000

is taxed at 22% Any further amount is taxed at 40% Which of these groups of numbers would

fall into the same equivalence class?

A. £4800; £14000; £28000

B. £5200; £5500; £28000

C. £28001; £32000; £35000

D. £5800; £28000; £32000



281: In case of Large Systems :

A. Only few tests should be run

B. Testing should be on the basis of Risk

C. Only Good Test Cases should be executed.

D. Test Cases written by good test engineers should be executed.



282: What is the expected result for each of the following test cases?

Rule1 Rule2 Rule3 Rule4

Citibank Card

Member

Yes Yes No No

Type of Room Silver Platinum Silver Platinum

Actions

Offer upgrade

To Gold Luxury

Yes No No No

Offer upgrade

to Silver

N/A Yes N/A No

A. Citibank card member, holding a Silver room

B. Non Citibank-member, holding a Platinum room

A. A – Don’t offer any upgrade, B – Don’t offer any upgrade.

B. A – Don’t offer any upgrade, B – Offer upgrade to Gold.

C. A – Offer upgrade to Silver, B – Offer upgrade to Silver.

D. A – Offer upgrade to Gold, B – Don’t offer any upgrade.



283: Which of the following is not phase of the Fundamental Test Process?

A. Test Planning and Control

B. Test implementation and Execution

C. Requirement Analysis

D. Evaluating Exit criteria and reporting



284: The structure of an incident report is covered in the Standard for Software Test

Documentation IEEE 829 and is called as:

A. Anomaly Report

B. Defect Report

C. Test Defect Report

D. Test Incident Report



285: Repeated Testing of an already tested program, after modification, to discover

any defects introduced or uncovered as a result of the changes in the software being

tested or in another related or unrelated software component:

A. Re Testing

B. Confirmation Testing

C. Regression Testing

D. Negative Testing



286: Consider the following state transition diagram of a switch. Which of the

following represents an invalid state transition?

A. OFF to ON

B. ON to OFF

C. FAULT to ON



287: We use the output of the requirement analysis, the requirement specification

as the input for writing:

A. User Acceptance Test Cases

B. Integration Level Test Cases

C. Unit Level Test Cases

D. Program specifications



288: Regression testing should be performed:

i. Every week

ii. After the software has changed

iii. As often as possible

iv. When the environment has changed

v. When the project manager says

A. i & ii are true, iii, iv & v are false

B. ii, iii & iv are true, i & v are false

C. ii & iv are true, i, iii & v are false

D. ii is true, i, iii, iv & v are false



289: Evaluating testability of the requirements and system are a part of which

phase:-

A. Test Analysis and Design

B. Test Planning and control

C. Test Implementation and execution

D. Evaluating exit criteria and reporting



290: Which of the following has highest level of independence in which test cases

are:

A. Designed by persons who write the software under test

B. Designed by a person from a different section

C. Designed by a person from a different organization

D. Designed by another person



291: Test planning has which of the following major tasks?

i. Determining the scope and risks, and identifying the objectives of testing.

ii. Determining the test approach (techniques,test items, coverage, identifying and

interfacing the teams involved in testing , testware)

iii. Reviewing the Test Basis (such as requirements,architecture,design,interface)

iv. Determining the exit criteria.

A. i,ii,iv are true and iii is false

B. i,,iv are true and ii is false

C. i,ii are true and iii,iv are false

D. ii,iii,iv are true and i is false



292: Deciding How much testing is enough should take into account :-

i. Level of Risk including Technical and Business product and project risk

ii. Project constraints such as time and budget

iii. Size of Testing Team

iv. Size of the Development Team

A. i,ii,iii are true and iv is false

B. i,,iv are true and ii is false

C. i,ii are true and iii,iv are false

D. ii,iii,iv are true and i is false



293: Which of the following will be the best definition for Testing:

A. The goal / purpose of testing is to demonstrate that the program works.

B. The purpose of testing is to demonstrate that the program is defect free.

C. The purpose of testing is to demonstrate that the program does what it is supposed to

do.

D. Testing is executing Software for the purpose of finding defects.



294: Minimum Tests Required for Statement Coverage and Branch Coverage:

Read P

Read Q

If p+q > 100 then

Print "Large"

End if

If p > 50 then

Print "pLarge"

End if

A. Statement coverage is 2, Branch Coverage is 2

B. Statement coverage is 3 and branch coverage is 2

C. Statement coverage is 1 and branch coverage is 2

D. Statement Coverage is 4 and Branch coverage is 2



295: Match every stage of the software Development Life cycle with the Testing Life

cycle:

i. Hi-level design a Unit tests

ii. Code b Acceptance tests

iii. Low-level design c System tests

iv. Business requirements d Integration tests

A. i-d , ii-a , iii-c , iv-b

B. i-c , ii-d , iii-a , iv-b

C. i-b , ii-a , iii-d , iv-c

D. i-c , ii-a , iii-d , iv-b



296: Which of the following is a part of Test Closure Activities?

i. Checking which planned deliverables have been delivered

ii. Defect report analysis.

iii. Finalizing and archiving testware.

iv. Analyzing lessons.

A. i , ii , iv are true and iii is false

B. i , ii , iii are true and iv is false

C. i , iii , iv are true and ii is false

D. All of above are true



297: Which of the following is NOT part of a high level test plan?

A. Functions not to be tested.

B. Environmental requirements.

C. Analysis of Specifications.

D. Entry and Exit criteria.



298: If a candidate is given an exam of 40 questions, should get 25 marks to pass

(61%) and should get 80% for distinction, what is equivalence class.

A. 23, 24, 25

B. 0, 12, 25

C. 30, 36, 39

D. 32,37,40



299: Which of the following statements is true of static analysis:

A. Compiling code is not a form of static analysis.

B. Static analysis need not be performed before imperative code is executed.

C. Static analysis can find faults that are hard to find with dynamic testing.

D. Extensive statistic analysis will not be needed if white- Box testing is to be performed.



300: In a system designed to work out the tax to be paid: An employee has $4000 of

salary tax free. The next $1500 is taxed at 10% The next $28000 is taxed at 22% Any

further amount is taxed at 40%

Which of these groups of numbers would fall into the same equivalence class?

A. $5800; $28000; $32000

B. $0; $200; $4200

C. $5200; $5500; $28000

D. $28001; $32000; $35000



301: Cost of the reviews will not include.

A. Review process itself

B. Metrics analysis

C. Tool support.

D. Process improvement.



302: Regression testing always involves

A. Testing whether a known software fault been fixed.

B. Executing a large number of different tests.

C. Testing whether modifications have introduced adverse side effects.

D. Using a test automation tool.



303: Capture and replay facilities are least likely to be used to _______

A. Performance testing

B. Recovery testing

C. GUI testing

D. User requirements.



304: Which tool will be used to test the flag memory leaks and unassigned pointers

A. Dynamic analysis tool

B. Static Analysis tool.

C. Maintenance tool.

D. Configuration tool.



305: Cyclomatic complexity is used to calculate

A. Number of independent paths in the basis set of a program

B. Number of binary decisions + 1

C. Number bound for the number of tests that must be conducted to ensure that all

statements have been executed at least once

D. Number of branches and decisions



306: Which of the following is not included in Test Plan.

A. Features to be tested.

B. Environmental needs.

C. Suspension criteria.

D. Expected results.



307: Software quality is not relevant to _______

A. Correctness

B. Usability

C. Viability

D. Reusability.



308: Match the following:

1. Test estimation

2. Test control

3. Test monitoring

a. Measures of tracking process

b. Effort required to perform activities

c. Reallocation of resources

A. 1-b, 2-c, 3-a

B. 1-b, 2-a, 3-c

C. 1-c, 2-a, 3-b

D. 1-a, 2-b, 3-c



309: When do you stop testing?

A. When the specified number of faults are found.

B. When the test completion criteria are met.

C. When all high and medium priority tests are complete.

D. When all statements have been executed



310: What is the smallest number of test cases required to Provide 100% branch

coverage?

If(x>y) x=x+1;

else y=y+1;



while(x>y)

{

y=x*y; x=x+1;

}

A. 1

B. 2

C. 3

D. 4



311: Match the following.

1. Configuration identification

2. Configuration control

3. Status reporting

4. Configuration auditing

a. Maintains of CI’s in a library

b. Checks on the contents of the library

c. Function recording and tracking problems.

d. Requires the all CI’s and their versions in the system are known

A. 1-d, 2-c, 3-d, 4-a.

B. 1-d, 2-a, 3-c, 4-b.

C. 1-a, 2-b, 3-d, 4-c.

D. 1-c, 2-b, 3-a, 4-d.



312: Integration testing in the large involves:

A. Testing the system when combined with other systems.

B. Testing a sub-system using stubs and drivers.

C. Testing a system with a large number of users.

D. Combing software components and testing them in one go.



313: One of the following is not a part of white box testing as per BS7925-II

standards.

A. Random testing

B. Data Flow testing.

C. Statement testing.

D. Syntax testing.



314: A piece of software has been given _______what tests in the Following will you

perform?

1) Test the areas most critical to business processes

2) Test the areas where faults will be maximum

3) Test the easiest functionalities

A. 1&2 are true and 3 is false.

B. 1,2&3 are true.

C. 1 is true, 2&3 are false.

D. 1&2 are false, 3 is true



315: Which of the following is a type of non-functional testing?

A. Usability testing.

B. Statement Coverage.

C. Dataflow testing.

D. Cause-effect graphing.



316: What type of testing will you perform on internet banking solution?

A. System integration

B. Functional testing

C. Non-functional testing.

D. Requirements testing



317: Which of the following are false?

A. Incidents should always be investigated and resolved.

B. Incidents occur when expected and actual results differ.

C. Incidents can be analyzed to assist in test process improvement.

D. An incident can be raised against documentation.



318: Testing is not done to ______

A. Find faults

B. Improve quality

C. Check user friendliness.

D. Improve software accuracy



319: A field failure occurs when multiple users access a system. Which of the

following is true?

A. This is an acceptable risk of a multi-user system.

B. Insufficient functional testing has been performed.

C. This indicates an important non-functional requirement was not specified and tested.

D. It is not possible to test against such events prior to release.



320: People who don’t participate in technical reviews

A. Analysts

B. Management

C. Developers

D. Testers



321: What is failure?

A. Deviation from expected result to actual result

B. Defect in the software.

C. Error in the program code.

D. Fault in the system.



322: Exclusive use of white box testing in a test-phase will:

A. Ensure the test item is adequately tested.

B. Make the need for black-box testing redundant.

C. Run the risk that the requirements are not satisfied.

D. Suffices for the unit testing phase.



323: Which of the following is least important in test management?

A. Estimating test duration.

B. Incident Management.

C. Configuration Management.

D. De-bugging.



324: A standard for software testing terminology is:

A. IEEE 802.11

B. ISO 9001

C. BS 7925-1

D. BS 7925-2



325: Which of the following is NOT a characteristic of User Acceptance Testing?

A. Use of automated test execution tools.

B. Testing performed by users.

C. Testing against acceptance test criteria.

D. Integration of system with user documentation.



326: Which of the following provides the biggest potential cost saving from use of

CAST?

A. Test management

B. Test design

C. Test planning

D. Test execution



327: What type of testing is done to supplement the rigorous testing?

A. Regression testing.

B. Integration testing.

C. Error Guessing

D. System testing.



328: To make a test effective it is most important that:

A. It is easy to execute.

B. It is designed to detect faults if present.

C. The expected outcome is specified before execution.

D. It is unlikely to delay progress.



329: Error guessing is:

A. An appropriate way of deriving system tests.

B. Only used if good requirements are not available.

C. Only used when good requirements are available.

D. The most appropriate way of deriving system tests.



330: Amount of testing performed will not depend on

A. Risks involved

B. Contractual requirements

C. Legal requirements

D. Test data.



331: For software to be reliable it must:

A. Be easy to maintain.

B. Be unlikely to cause a failure.

C. Never fail under any circumstances.

D. Be written according to coding standards



332: In a system designed to work out the tax to be paid: An employee has $4000 of

salary tax free. The next $1500 is taxed at 10% The next $28000 is taxed at 22% Any

further amount is taxed at 40%

To the nearest $ which of these is a valid Boundary Value Analysis test case?

A. $1500

B. $32001

C. $28000

D. $33501



333: Faults found by users are due to:

A. Poor quality software

B. Poor software and poor testing

C. Bad luck

D. Insufficient time for testing

334: An incident logging system

A. Only records defects

B. Is of limited value

C. Is a valuable source of project information during testing if it contains all incidents

D. Should be used only by the test team.



335: The later in the development life cycle a fault is discovered, the more

expensive it is to fix. Why?

A. The documentation is poor, so it takes longer to find out what the software is doing.

B. Wages are rising

C. The fault has been built into more documentation,code,tests, etc

D. None of the above



336: Which of the following is true?

A. Component testing should be black box, system testing should be white box.

B. If u find a lot of bugs in testing, you should not be very confident about the quality of

software

C. The fewer bugs you find, the better your testing was

D. The more tests you run, the more bugs you will find.



337: If the pseudo code below were a programming language ,how many tests are

required to achieve 100% statement coverage?

1. If x=3 then

2. Display_messageX;

3. If y=2 then

4. Display_messageY;

5. Else

6. Display_messageZ;

7. Else

8. Display_messageZ;

A. 1

B. 2

C. 3

D. 4



338: Software testing activities should start

A. As soon as the code is written

B. During the design stage

C. When the requirements have been formally documented

D. As soon as possible in the development life cycle

339: Using the same code example as question 17,how many tests are required to

achieve 100% branch/decision coverage?

A. 1

B. 2

C. 3

D. 4



340: A test design technique is

A. A process for selecting test cases

B. A process for determining expected outputs

C. A way to measure the quality of software

D. A way to measure in a test plan what has to be done



341: What is the main reason for testing software before releasing it?

A. To show that system will work after release

B. To decide when the software is of sufficient quality to release

C. To find as many bugs as possible before release

D. To give information for a risk based decision about release



342: Testware(test cases, test dataset)

A. Needs configuration management just like requirements, design and code

B. Should be newly constructed for each new version of the software

C. Is needed only until the software is released into production or use

D. Does not need to be documented and commented, as it does not form part of the

released software system



343: Which of the following is NOT a standard related to testing?

A. IEEE829

B. IEEE610

C. BS7925-1

D. BS7925-2



344: In which order should tests be run?

A. The most important tests first

B. The most difficult tests first(to allow maximum time for fixing)

C. The easiest tests first (to give initial confidence)

D. The order they are thought of



345: A program validates a numeric field as follows:

Values less than 10 are rejected, values between 10 and 21 are accepted, values greater

than or equal to 22 are rejected. Which of the following covers the MOST boundary values?

A. 9,10,11,22

B. 9,10,21,22

C. 10,11,21,22

D. 10,11,20,21



346: Which of the following is not the integration strategy?

A. Design based

B. Big-bang

C. Bottom-up

D. Top-down



347: Which of the following tools would you use to detect a memory leak?

A. State analysis

B. Coverage analysis

C. Dynamic analysis

D. Memory analysis



348: Which of the following statements are true?

A. Faults in program specifications are the most expensive to fix.

B. Faults in code are the most expensive to fix.

C. Faults in requirements are the most expensive to fix

D. Faults in designs are the most expensive to fix.



349: Increasing the quality of the software, by better development methods, will

affect the time needed for testing (the test phases) by:

A. Reducing test time

B. No change

C. Increasing test time

D. Can’t say



350: Which of the following is a black box design technique?

A. Statement testing

B. Equivalence partitioning

C. Error- guessing

D. Usability testing



351: When reporting faults found to developers, testers should be:

A. As polite, constructive and helpful as possible

B. Firm about insisting that a bug is not a "feature" if it should be fixed

C. Diplomatic, sensitive to the way they may react to criticism

D. All of the above



352: Which of the following statements is not true

A. Performance testing can be done during unit testing as well as during the testing of

whole system

B. The acceptance test does not necessarily include a regression test

C. Verification activities should not involve testers (reviews, inspections etc)

D. Test environments should be as similar to production environments as possible



353: What is the important criterion in deciding what testing technique to use?

A. How well you know a particular technique

B. The objective of the test

C. How appropriate the technique is for testing the application

D. Whether there is a tool to support the technique



354: When should you stop testing?

A. When time for testing has run out.

B. When all planned tests have been run

C. When the test completion criteria have been met

D. When no faults have been found by the tests run



355: Coverage measurement

A. Is nothing to do with testing

B. Is a partial measure of test thoroughness

C. Branch coverage should be mandatory for all software

D. Can only be applied at unit or module testing, not at system testing



356: Which of the following is NOT a type of non-functional test?

A. State-Transition

B. Usability

C. Performance

D. Security



357: Which of the following is the component test standard?

A. IEEE 829

B. IEEE 610

C. BS7925-1

D. BS7925-2



358: A program validates a numeric field as follows:

Values less than 10 are rejected, values between 10 and 21 are accepted, values greater

than or equal to 22 are rejected. Which of the following input values cover all of the

equivalence partitions?

A. 10,11,21

B. 3,20,21

C. 3,10,22

D. 10,21,22



359: Which is not true-The black box tester

A. Should be able to understand a functional specification or requirements document

B. Should be able to understand the source code.

C. Is highly motivated to find faults

D. Is creative to find the system’s weaknesses



360: Which of the following is a static test?

A. Code inspection

B. Coverage analysis

C. Usability assessment

D. Installation test



361: A program with high cyclometic complexity is almost likely to be:

A. Large

B. Small

C. Difficult to write

D. Difficult to test



362: Which of the following is the odd one out?

A. White box

B. Glass box

C. Structural

D. Functional



363: Which of the following techniques are black box techniques?

A. State transition testing, code testing, agile testing

B. Equivalence partitioning, state transition testing, decision table testing

C. System testing, acceptance testing, equivalence partitioning

D. System integration testing, system testing, decision table testing



364: A number of critical bugs are fixed in software. All the bugs are in one module,

related to reports. The test manager decides to do regression testing only on the

reports module.

A. The test manager should do only automated regression testing.

B. The test manager is justified in her decision because no bug has been fixed in other

modules

C. The test manager should only do confirmation testing. There is no need to do regression

testing

D. Regression testing should be done on other modules as well because fixing one module

may affect other modules



365: Which of the following statements contains a valid goal for a functional test set?

A. A goal is that no more failures will result from the remaining defects

B. A goal is to find as many failures as possible so that the cause of the failures can be

identified and fixed

C. A goal is to eliminate as much as possible the causes of defects

D. A goal is to fulfil all requirements for testing that are defined in the project plan.



366: What makes an inspection different from other review types?

A. It is led by a trained leader, uses formal entry and exit criteria and checklists

B. It is led by the author of the document to be inspected

C. It can only be used for reviewing design and code

D. It is led by the author, uses checklists, and collects data for improvement



367: Why does the boundary value analysis provide good test cases?

A. Because it is an industry standard

B. Because errors are frequently made during programming of the different cases near the

‘edges’ of the range of values

C. Because only equivalence classes that are equal from a functional point of view are

considered in the test cases

D. Because the test object is tested under maximal load up to its performance limits



368: If a program is tested and 100% branch coverage is achieved, which of the

following coverage criteria is then guaranteed to be achieved?

A. 100% Equivalence class coverage

B. 100% Condition coverage and 100% Statement coverage

C. 100% Statement coverage

D. 100% Multiple condition coverage



369: A defect management system shall keep track of the status of every defect

registered and enforce the rules about changing these states. If your task is to test the

status tracking, which method would be best?

A. Logic-based testing

B. Use-case-based testing

C. State transition testing

D. Systematic testing according to the V-model



370: In system testing...

A. Both functional and non-functional requirements are to be tested

B. Only functional requirements are tested; non-functional requirements are validated in a

review

C. Only non-functional requirements are tested; functional requirements are validated in a

review

D. Only requirements which are listed in the specification document are to be tested



371: Integration testing has following characteristics

I. It can be done in incremental manner

II. It is always done after system testing

III. It includes functional tests

IV. It includes non-functional tests

A. I, II and III are correct

B. I is correct

C. I, III and IV are correct



372: Which of the following activities differentiate a walkthrough from a formal

review?

A. A walkthrough does not follow a defined process

B. For a walkthrough individual preparation by the reviewers is optional

C. A walkthrough requires meeting

D. A walkthrough finds the causes of failures, while formal review finds the failures



373: Why is testing necessary?

A. Because testing is good method to make there are not defects in the software

B. Because verification and validation are not enough to get to know the quality of the

software

C. Because testing measures the quality of the software system and helps to increase the

quality

D. Because testing finds more defects than reviews and inspections.

D. I, II and IV are correct



374: In foundation level syllabus you will find the main basic principles of testing.

Which of the following sentences describes one of these basic principles?

A. Complete testing of software is attainable if you have enough resources and test tools

B. With automated testing you can make statements with more confidence about the

quality of a product than with manual testing

C. For a software system, it is not possible, under normal conditions, to test all input and

output combinations.

D. A goal of testing is to show that the software is defect free.



375: Which of the following is true

A. Testing is the same as quality assurance

B. Testing is a part of quality assurance

C. Testing is not a part of quality assurance

D. Testing is same as debugging



376: This part of a program is given:

WHILE (condition A) Do B

END WHILE

How many decisions should be tested in this code in order to achieve 100% decision

coverage?

A. 2

B. Indefinite

C. 1

D. 4



377: In a flight reservation system, the number of available seats in each plane

model is an input. A plane may have any positive number of available seats, up to the

given capacity of the plane. Using Boundary Value analysis, a list of available – seat

values were generated. Which of the following lists is correct?

A. 1, 2, capacity -1, capacity, capacity plus 1

B. 0, 1, capacity, capacity plus 1

C. 0, 1, 2, capacity plus 1, a very large number

D. 0, 1, 10, 100, capacity, capacity plus one



378: Which of the following is a valid collection of equivalence classes for the

following problem: An integer field shall contain values from and including 1 to and

including 15

A. Less than 1, 1 through 15, more than 15

B. Negative numbers, 1 through 15, above 15

C. Less than 1, 1 through 14, more than 15

D. Less than 0, 1 through 14, 15 and more



379: Which of the following is correct about static analysis tools

A. They help you find defects rather than failures

B. They are used by developers only

C. They require compilation of code

D. They are useful only for regulated industries



380: Which of the following is most often considered as components interface bug?

A. For two components exchanging data, one component used metric units, the other one

used British units

B. The system is difficult to use due to a too complicated terminal input structure

C. The messages for user input errors are misleading and not helpful for understanding the

input error cause

D. Under high load, the system does not provide enough open ports to connect to



381: Which of the following is correct about static analysis tools?

A. Static analysis tools are used only by developers

B. Compilers may offer some support for static analysis

C. Static analysis tools help find failures rather than defects

D. Static analysis tools require execution of the code to analyze the coverage



382: Which of the following list contains only non-functional tests?

A. Interoperability (compatibility) testing, reliability testing, performance testing

B. System testing, performance testing

C. Load testing, stress testing, component testing, portability testing

D. Testing various configurations, beta testing, load testing



383: Which set of metrics can be used for monitoring of the test execution?

A. Number of detected defects, testing cost;

B. Number of residual defects in the test object.

C. Percentage of completed tasks in the preparation of test environment; test cases

prepared

D. Number of test cases run / not run; test cases passed / failed



384: What test items should be put under configuration management?

A. The test object, the test material and the test environment

B. The problem reports and the test material

C. Only the test object. The test cases need to be adapted during agile testing

D. The test object and the test material



385: This part of a program is given:

WHILE (condition A)

Do B

END WHILE

How many paths should be tested in this code in order to achieve 100% path coverage?

A. One

B. Indefinite

C. Two

D. Four



386: What is the purpose of test exit criteria in the test plan?

A. To specify when to stop the testing activity

B. To set the criteria used in generating test inputs

C. To ensure that the test case specification is complete

D. To know when a specific test has finished its execution



387:If a program is tested and 100% condition coverage is achieved, which of the

following coverage criteria is then guaranteed to be achieved?

A. 100% branch coverage

B. 100% condition coverage and 100% statement coverage

C. Equivalence class and boundary value coverage

D. No other white box coverage criterion is guaranteed to be fulfilled 100%



388: Which of the following can be root cause of a bug in a software product?

(I) The project had incomplete procedures for configuration management.

(II) The time schedule to develop a certain component was cut.

(III) the specification was unclear

(IV) Use of the code standard was not followed up

(V) The testers were not certified

A. (I) and (II) are correct

B. (I) through (IV) are correct

C. (III) through (V) are correct

D. (I), (II) and (IV) are correct



389: The following list contains risks that have been identified for a software

product to be developed. Which of these risks is an example of a product risk?

A. Not enough qualified testers to complete the planned tests

B. Software delivery is behind schedule

C. Threat to a patient’s life

D. 3rd party supplier does not supply as stipulated



390: Which of the following statements is correct?

A. Static analysis tools produce statistics during program execution

B. Configuration management systems allow us to provide accurate defect statistics of

different configurations

C. Stress testing tools examine the behavior of the test object at or beyond full load

D. Performance measurement tools can be used in all phases of software life-cycle



391: Which of the following project inputs influence testing?

(I) Contractual requirements

(II) Legal requirements(III) Industry standards

(IV) Application risk

(V) Project size



A. (I) through (III) are correct

B. All alternatives are correct

C. (II) and (V) are correct

D. (I), (III) and (V) are correct



392: A test engineer is testing a Video Player (VCR), and logs the following report:

Title: Fast Forward stops after 2 minutes. It happens every time

Expected result: Fast forward continues till the end of the tape

Severity: High

Priority: Urgent

What important information did the engineer leave out?

A. Identification (Software and hardware) of the VCR

B. Actual result

C. History of the report

D. Ideas for the test case improvement



393: Maintenance testing is:

A. Testing management

B. Synonym of testing the quality of service

C. Triggered by modifications, migration or retirement of existing software

D. Testing the level of maintenance by the vendor



394: Why is incremental integration preferred over "big bang" integration?

A. Because incremental integration has better early defects screening and isolation ability

B. Because "big bang" integration is suitable only for real time applications

C. Incremental integration is preferred over "Big Bang Integration" only for "bottom up"

development model

D. Because incremental integration can compensate for weak and inadequate component

testing



395: V-Model is:

A. A software development model that illustrates how testing activities integrate with

software development phases

B. A software life-cycle model that is not relevant for testing

C. The official software development and testing life-cycle model of ISTQB

D. A testing life cycle model including unit, integration, system and acceptance phases



396: Which of the following items need not to be given in an incident report?

A. The version number of the test object

B. Test data and used environment

C. Identification of the test case that failed

D. The location and instructions on how to correct the fault



397: Test data planning essentially includes

A. Network

B. Operational Model

C. Boundary value analysis

D. Test Procedure Planning



398: Acceptance testing means

A. Testing performed on a single stand – alone module or unit of code

B. Testing after changes have been made to ensure that no unwanted changes were

introduced

C. Testing to ensure that the system meets the needs of the organization and end user.

D. Users test the application in the developers environment



399: The _______ testing should include operational tests of the new environment

as well as of the changed software

A. System Testing

B. Integration testing

C. Component testing

D. Maintenance testing



400: A risk-based approach to testing provides proactive opportunities to reduce the

levels of product risk, starting in the initial stages of a project

A. True

B. False



401: Functional testing is mostly

A. Validation techniques

B. Verification techniques

C. Both of the above

D. None of the above



402: Branch Coverage

A. Another name for decision coverage

B. Another name for all-edges coverage

C. Another name for basic path coverage

D. All the above



403: The _________ Is the activity where general testing objectives are transformed

into tangible test conditions and test designs

A. Testing Planning

B. Test Control

C. Test analysis and design

D. Test implementation



404: Integration testing where no incremental testing takes place prior to all the

system’s components being combined to form the system.

A. System testing

B. Component Testing

C. Incremental Testing

D. Big bang testing



405: A test case design technique for a component in which test cases are designed

to execute statements is called as?

A. State transition Testing

B. Static Testing

C. Transition testing

D. Statement testing



406: Who should have technical and Business background.

A. Moderator

B. Author

C. Reviewer

D. Recorder



407: A test plan defines

A. What is selected for testing

B. Objectives and results

C. Expected results

D. Targets and misses



408: Component integration testing can be done

A. Before Integration testing

B. After unit testing

C. After component testing

D. After system testing



409: Test basis documentation is analyzed in which phase of testing

A. Test Analysis

B. Test Design

C. Test Execution

D. Test Planning



410: Which one is not the task of test leader?

A. Coordinate the test strategy and plan with project managers and others

B. Decide about the implementation of the test environment

C. Write test summary reports

D. Review and contribute to test plans



411: if (condition1 && (condition2 function1()))

statement1;

else

statement2;

A. Decision coverage

B. Condition coverage

C. Statement coverage

D. Path Coverage



412: _________ reviews are often held with just the programmer who wrote the

code and one or two other programmers or testers.

A. Formal Reviews

B. Peer Reviews

C. Semi Formal Reviews

D. All of the above



413: In ________ testing test cases i.e input to the software are created based on

the specifications languages

A. State Transition Testing

B. Random Testing

C. Syntax Testing

D. Penetration testing



414: White Box Testing

A. Same as glass box testing

B. Same as clear box testing

C. Both A. and B.

D. None of the above.



415: Verification activities during design stages are

A. Reviewing and Inspecting

B. Inspecting and Testing

C. Reviewing and Testing

D. Reviewing, Inspecting and Testing.



416: Equivalence partitioning consists of various activities:

A. Ensure that test cases test each input and output equivalence class at least once

B. Identify all inputs and all outputs

C. Identify equivalence classes for each input

D. All of the above



417: Static Analysis

A. Same as static testing

B. Done by the developers

C. Both A. and B

D. None of the above



418: Size of a project is defined in terms of all the following except

A. Person days

B. Person hours

C. Calendar months

D. None of the above



419: Testing responsibilities:

Tester 1 – Verify that the program is able to display images clearly on all 10 of the monitors

in the lab

Tester 2 - Make sure the program instructions are easy to use Security concerns are

important for which type of applications

Tester 3 – Verify that the calculation module works correctly by using both scripts and ad

hoc testing. Which term is used to refer to the testing that is performed by

Tester 3 in the above scenario?

A. Unit testing

B. Algorithm specific testing

C. Compatibility testing

D. Black box testing



420: Objective of review meeting is

A. To identify problems with design

B. To solve the problems with design

C. Both A. and B

D. None of the above.



421: QC is

A. Phase building activity

B. Intermediate activity

C. End of Phase activity

D. Design activity



422: Which tool store information about versions and builds of software and testware

A. Test Management tool

B. Requirements management tool

C. Configuration management tool

D. Static analysis too;



423: Testing Process comprised of

A. Test Plan and Test Cases

B. Test log and Test Status

C. Defect Tracking

D. All of the above



424: Preparing and automating test cases before coding is called

A. Test first approach

B. Test-driven development

C. Both A. & B.

D. None of the above



425: Which one is not characteristic of test management tool?

A. Support for the management of tests and the testing activities carried out

B. Interfaces to test execution tools

C. Quantitative analysis related to tests

D. Check for consistency and undefined requirements

E. None of the above



426: Code Walkthrough

A. Type of dynamic testing

B. Type of static testing

C. Neither dynamic nor static

D. Performed by the testing team



427: Risk analysis talks about

A. The data required for testing, the infrastructure requirements to manage the data as

well as the methods for preparing test data, requirements, converters and sources

B. Details what types of tests must be conducted, what stages of testing are required and

outlines the sequence and timing of tests

C. A testing goal. It is a statement of what the tester is expected to accomplish or validate

during a testing activity. These guide the development of test cases and procedures

D. None of the above



428: What are the 2 major components taken into consideration with risk analysis?

A. The probability the negative event will occur

B. The potential loss or impact associated with the event

C. Both A. and B.

D. Neither A. nor B.



429: If the application is complex, but NOT data intensive and is to be tested on one

configuration and 2 rounds, the easiest method to test is

A. Manual testing

B. Automation testing

C. Both

D. None



430: Functional tests can be performed at all test levels

A. True

B. False



431: Structural Testing

A. Same as black box testing

B. Same as white box testing

C. Same as functional testing

D. None of the above.



432: In formal review, Rework: fixing defects found typically done by _________

A. Moderator

B. Author

C. Reviewer

D. Recorder



433: The _________ may facilitate the testing of components or part of a system by

simulation the environment in which the test object will run

A. Test Design tool

B. Test data preparation tool

C. Test execution tool

D. Test harness

E. None of the above



434: Regression testing mainly helps in

A. Re-testing fixed defects

B. Checking for side-effects of fixes

C. Checking the core gaps

D. Ensuring high level sanity



435: Review is one of the methods of V&V. The other methods are

A. Inspection

B. Walkthrough

C. Testing

D. All of the above



436: Which review is inexpensive

A. Informal Review

B. Walkthrough

C. Technical review

D. Inspection



437: Following are some of the testing risks

A. Budget, Test environment

B. Budget, Number of qualified test resources

C. Budget, Number of qualified test resources, Test environment

D. None of the above



438: Random Testing

A. Program is tested randomly sampling the input.

B. A black-box testing technique

C. Both A. and B.

D. None of the above.



439: Black-box testing technique is also called as structure based technique

A. True

B. False



440: Reliability, usablility, efficiency are

A. Functional characteristics

B. Non functional characteristics

C. Both A. & B.

D. None of the above



441: Test Plan

A. Road map for testing

B. Tells about the actual results and expected results

C. Both a and b

D. None of the above



442: User Acceptance Testing

A. Same as Alpha Testing

B. Same as Beta Testing

C. Combination of Alpha and Beta Testing

D. None of the above



443: Path coverage includes

A. Statement coverage

B. Condition coverage

C. Decision coverage

D. None of these



444: Which testing technique do you prefer for the following situations?

1. Severe time pressure

2. Inadequate specification

A. Decision testing

B. Error guessing

C. Statement testing

D. Exploratory testing



445: Recovery testing is a system test that forces the software to fail and verifies

that data recovery is properly performed. The following should be checked for

correctness

1. Re-initialization

2. Restart

3. Data Recovery

4. Check Point Mechanism

A. 1 and 2

B. 1, 2 and 3

C. 1, 2, 3 and 4

D. 2 and 4



446: Data flow analysis studies:

A. Possible communications bottlenecks in a program.

B. The rate of change of data values as a program executes.

C. The use of data on paths through the code.

D. The intrinsic complexity of the code.



447: Which of the following is NOT a white box technique?

A. Statement testing

B. Path testing

C. Data flow testing

D. State transition testing



448: Which one of the following describes the major benefit of verification early in

the life cycle?

A. It allows the identification of changes in user requirements.

B. It facilitates timely set up of the test environment.

C. It reduces defect multiplication.

D. It allows testers to become involved early in the project.



449: Which of the following is false?

A. In a system two different failures may have different severities.

B. A system is necessarily more reliable after debugging for the removal of a fault.

C. A fault need not affect the reliability of a system.

D. Undetected errors may lead to faults and eventually to incorrect behavior.



450: Alpha testing is:

A. Post-release testing by end user representatives at the developer’s site.

B. The first testing that is performed.

C. Pre-release testing by end user representatives at the developer’s site.

D. Pre-release testing by end user representatives at their sites.



451: We split testing into distinct stages primarily because:

A. Each test stage has a different purpose.

B. It is easier to manage testing in stages.

C. We can run different tests in different environments.

D. The more stages we have, the better the testing.



452: Which of the following would NOT normally form part of a test plan?

A. Features to be tested

B. Incident reports

C. Risks

D. Schedule



453: Which of the following is a form of functional testing?

A. Boundary value analysis

B. Usability testing

C. Performance testing

D. Security testing



454: Which one of the following statements about system testing is NOT true?

A. System tests are often performed by independent teams.

B. Functional testing is used more than structural testing.

C. Faults found during system tests can be very expensive to fix.

D. End-users should be involved in system tests.



455: Which of the following is not described in a unit test standard?

A. Syntax testing

B. Equivalence partitioning

C. Stress testing

D. Modified condition/decision coverage



456: Which of the following is likely to benefit most from the use of test tools

providing test capture and replay facilities?

A. Regression testing

B. Integration testing

C. System testing

D. User acceptance testing



457: Which of the following is false?

A. Incidents should always be fixed.

B. An incident occurs when expected and actual results differ.

C. Incidents can be analysed to assist in test process improvement.

D. An incident can be raised against documentation.



458: Static analysis is best described as:

A. The analysis of batch programs.

B. The reviewing of test plans.

C. The analysis of program code.

D. The use of black box testing.



459: Which of the following statements is NOT correct?

A. A minimal test set that achieves 100% LCSAJ coverage will also achieve 100% branch

coverage.

B. A minimal test set that achieves 100% path coverage will also achieve 100% statement

coverage.

C. A minimal test set that achieves 100% path coverage will generally detect more faults

than one that achieves 100% statement coverage.

D. A minimal test set that achieves 100% statement coverage will generally detect more

faults than one that achieves 100% branch coverage.



460: Which of the following statements about reviews is true?

A. Reviews cannot be performed on user requirements specifications.

B. Reviews are the least effective way of testing code.

C. Reviews are unlikely to find faults in test plans.

D. Reviews should be performed on specifications, code, and test plans.



461: What is the main difference between a walkthrough and an inspection?

A. An inspection is lead by the author, whilst a walkthrough is lead by a trained moderator.

B. An inspection has a trained leader, whilst a walkthrough has no leader.

C. Authors are not present during inspections, whilst they are during walkthroughs.

D. A walkthrough is lead by the author, whilst an inspection is lead by a trained moderator.



462: Which of these activities provides the biggest potential cost saving from the use

of CAST?

A. Test management

B. Test design

C. Test execution

D. Test planning

463: Which of the following is NOT true of incidents?

A. Incident resolution is the responsibility of the author of the software under test.

B. Incidents may be raised against user requirements.

C. Incidents require investigation and/or correction.

D. Incidents are raised when expected and actual results differ.



464: Which of the following characterizes the cost of faults?

A. They are cheapest to find in the early development phases and the most expensive to fix

in the latest test phases.

B. They are easiest to find during system testing but the most expensive to fix then.

C. Faults are cheapest to find in the early development phases but the most expensive to

fix then.

D. Although faults are most expensive to find during early development phases, they are

cheapest to fix then.



465: Which one of the following statements, about capture-replay tools, is NOT

correct?

A. They are used to support multi-user testing.

B. They are used to capture and animate user requirements.

C. They are the most frequently purchased types of CAST tool.

D. They capture aspects of user behaviour.



466: Which of the following is true of the V-model?

A. It states that modules are tested against user requirements.

B. It only models the testing phase.

C. It specifies the test techniques to be used.

D. It includes the verification of designs.



467: Error guessing:

A. Supplements formal test design techniques.

B. Can only be used in component, integration and system testing.

C. Is only performed in user acceptance testing.

D. Is not repeatable and should not be used.



468: In a system designed to work out the tax to be paid:

An employee has £4000 of salary tax free. The next £1500 is taxed at 10%

The next £28000 is taxed at 22%

Any further amount is taxed at 40%

Which of these groups of numbers would fall into the same equivalence class?

A. £4800; £14000; £28000

B. £5200; £5500; £28000

C. £28001; £32000; £35000

D. £5800; £28000; £32000



469: The oracle assumption:

A. Is that there is some existing system against which test output may be checked.

B. Is that the tester can routinely identify the correct outcome of a test.

C. Is that the tester knows everything about the software under test.

D. Is that the tests are reviewed by experienced testers.

470: In prioritising what to test, the most important objective is to:

A. Find as many faults as possible.

B. Test high risk areas.

C. Obtain good test coverage.

D. Test whatever is easiest to test.



471: The most important thing about early test design is that it:

A. Makes test preparation easier.

B. Means inspections are not required.

C. Can prevent fault multiplication.

D. Will find all faults.



472: A configuration management system would NOT normally provide:

A. Linkage of customer requirements to version numbers.

B. Facilities to compare test results with expected results.

C. The precise differences in versions of software component source code.

D. Restricted access to the source code library.



473: Integration testing in the small:

A. Tests the individual components that have been developed.

B. Tests interactions between modules or subsystems.

C. Only uses components that form part of the live system.

D. Tests interfaces to other systems.



474: Which of the following requirements is testable?

A. The system shall be user friendly.

B. The safety-critical parts of the system s

all contain 0 faults.

C. The response time shall be less than one second for the specified design load.

D. The system shall be built to be portable.



475: An important benefit of code inspections is that they:

A. Enable the code to be tested before the execution environment is ready.

B. Can be performed by the person who wrote the code.

C. Can be performed by inexperienced staff.

D. Are cheap to perform.



476: Test cases are designed during:

A. Test recording.

B. Test planning.

C. Test configuration.

D. Test specification.



477: A failure is:

A. Found in the software; the result of an error.

B. Departure from specified behaviour.

C. An incorrect step, process or data definition in a computer program.

D. A human action that produces an incorrect result.



478: How would you estimate the amount of re-testing likely to be required?

A. Metrics from previous similar projects

B. Discussions with the development team

C. Time allocated for regression testing

D. A. & B.



479: Given the following sets of test management terms (v-z), and activity

descriptions (1-5), which one of the following best pairs the two sets?

v - Test control

w - Test monitoring

x - Test estimation

y - Incident management

z - Configuration control

1 - Calculation of required test resources

2 - Maintenance of record of test results

3 - Re-allocation of resources when tests overrun

4 - Report on deviation from test plan

5 - Tracking of anomalous test results

A. v-3,w-2,x-1,y-5,z-4

B. v-2,w-5,x-1,y-4,z-3

C. v-3,w-4,x-1,y-5,z-2

D. v-2,w-1,x-4,y-3,z-5



480: In a system designed to work out the tax to be paid:

An employee has £4000 of salary tax free. The next £1500 is taxed at 10% The next £28000

is taxed at 22%

Any further amount is taxed at 40%

To the nearest whole pound, which of these is a valid Boundary Value Analysis test case?

A. £1500

B. £32001

C. £33501

D. £28000



481: Which of the following is NOT true of test coverage criteria?

A. Test coverage criteria can be measured in terms of items exercised by a test suite.

B. A measure of test coverage criteria is the percentage of user requirements covered.

C. A measure of test coverage criteria is the percentage of faults found.

D. Test coverage criteria are often used when specifying test completion criteria.



482: Analyze the following highly simplified procedure:

Ask: "What type of ticket do you require, single or return?"

IF the customer wants ‘return’

Ask: "What rate, Standard or Cheap-day?"

IF the customer replies ‘Cheap-day’

Say: "That will be £11:20"

ELSE

Say: "That will be £19:50"

ENDIF

ELSE



Say: "That will be £9:75"

ENDIF

Now decide the minimum number of tests that are needed to ensure that all the questions

have been asked, all combinations have occurred and all replies given.

A. 3

B. 4

C. 5

D. 6



483: Which of the following should NOT normally be an objective for a test?

A. To find faults in the software.

B. To assess whether the software is ready for release.

C. To demonstrate that the software doesn’t work.

D. To prove that the software is correct.



484: Enough testing has been performed when:

A. Time runs out.

B. The required level of confidence has been achieved.

C. No more faults are found.

D. The users won’t find any serious faults.



485: Which of the following is the best source of Expected Outcomes for User

Acceptance Test scripts?

A. Actual results

B. Program specification

C. User requirements

D. System specification



486: Which of the following are disadvantages of capturing tests by recording the

actions of a manual tester?

i The script may be unstable when unexpected events occur.

ii Data for a number of similar tests is automatically stored separately from the script.

iii Expected results must be added to the captured script.

iv The captured script documents the exact inputs entered by the tester.

v When replaying a captured test, the tester may need to debug the script if it doesn’t play

correctly.

A. i, iii, iv, v.

B. ii, iv and v.

C. i, ii and iv.

D. i and v.



487: Which of the following is a characteristic of good testing in any life cycle model?

A. All document reviews involve the development team.

B. Some, but not all, development activities have corresponding test activities.

C. Each test level has test objectives specific to that level.

D. Analysis and design of tests begins as soon as development is complete.



488: The process of designing test cases consists of the following activities:

i. Elaborate and describe test cases in detail by using test design techniques.

ii. Specify the order of test case execution.

1 iii. Analyse requirements and specifications to determine test conditions.

iv. Specify expected results.

According to the process of identifying and designing tests, what is the correct order of

these activities?

A. iii, i, iv, ii.

B. iii, iv, i, ii.

C. iii, ii, i, iv.

D. ii, iii, i, iv.



489: Which is the MOST important advantage of independence in testing?

A. An independent tester may find defects more quickly than the person who wrote the

software.

B. An independent tester may be more focused on showing how the software works than the

person who wrote the software.

C. An independent tester may be more effective and efficient because they are less

familiar with the software than the person who wrote it.

D. An independent tester may be more effective at finding defects missed by the person

who wrote the software.



490: Given the following specification, which of the following values for age are in

the SAME equivalence partition?

If you are less than 18, you are too young to be insured. Between 18 and 30 inclusive, you

will receive a 20% discount. Anyone over 30 is not eligible for a discount.

A. 17, 18, 19.

B. 29, 30, 31.

C. 18, 29, 30.

D. 17, 29, 31.



491: Consider the following statements:

i.100% statement coverage guarantees 100% branch coverage.

ii.100% branch coverage guarantees 100% statement coverage.

iii.100% branch coverage guarantees 100% decision coverage.

iv.100% decision coverage guarantees 100% branch coverage.

v.100% statement coverage guarantees 100% decision coverage.

A. ii is True; i, iii, iv & v are False

B. i & v are True; ii, iii & iv are False

C. ii & iii are True; i, iv & v are False

D. ii, iii & iv are True; i & v are False



492: What is the difference between a project risk and a product risk?

A. Project risks are potential failure areas in the software or system; product risks are risks

that surround the project’s capability to deliver its objectives.

B. Project risks are the risks that surround the project’s capability to deliver its objectives;

product risks are potential failure areas in the software or system.

C. Project risks are typically related to supplier issues, organizational factors and technical

issues; product risks are typically related to skill and staff shortages.

D. Project risks are risks that delivered software will not work; product risks are typically

related to supplier issues, organizational factors and technical issues.



493: During which fundamental test process activity do we determine if MORE tests

are needed?

A Test implementation and execution.

B Evaluating test exit criteria.

C Test analysis and design.

D Test planning and control.



494: What is the MAIN purpose of a Master Test Plan?

A. To communicate how incidents will be managed.

B. To communicate how testing will be performed.

C. To produce a test schedule.

D. To produce a work breakdown structure.



495: Which of the following defines the sequence in which tests should be executed?

A. Test plan.

B. Test procedure specification.

C. Test case specification.

D. Test design specification.



496: Which of the following is a major task of test planning?

A. Determining the test approach.

B. Preparing test specifications.

C. Evaluating exit criteria and reporting.

D. Measuring and analyzing results.



497: What is the main purpose of impact analysis for testers?

A. To determine the programming effort needed to make the changes.

B. To determine what proportion of the changes need to be tested.

C. To determine how much the planned changes will affect users.

D. To determine how the existing system may be affected by changes.

498: In a system designed to work out the tax to be paid:

An employee has £4000 of salary tax free.

The next £1500 is taxed at 10%.

The next £28000 after that is taxed at 22%.

Any further amount is taxed at 40%.

To the nearest whole pound, which of these is a valid Boundary Value Analysis test case?

A. £28000.

B. £33501.

C. £32001.

D. £1500.

499: Which of the following tools is most likely to contain a comparator?

A. Dynamic Analysis tool.

B. Test Execution tool.

C. Static Analysis tool.

D. Security tool.

500: When software reliability measures are used to determine when to stop testing,

the best types of test cases to use are those that

A. Exercise system functions in proportion to the frequency they will be used in the

released product

B. Push the system beyond its designed operation limits and are likely to make the system

fail

C. Exercise unusual and obscure scenarios that may not have been considered in design

D. Exercise the most complicated and the most error-prone portions of the system